Close to Critical Flow

Close to Critical Flow

A bathymetry and velocity survey was recently performed of irrigation channel upstream of the gauging weir at Gila Gravity Main Canal. Survey control at the measurement site was established by performing static surveys at two predefined bench marks with Stonex S900A Smart Antenna. The bathymetry and velocity data of the survey area was collected using Hypack with HydroSurveyor and rQPOD. The velocity mapped upstream of gauging weir shows typical velocity distribution when the flow transitions from a shallow to a deeper section in the channel. The shallow section upstream in the channel is the remains of cofferdam that was constructed during the constructions of the gauging weir. The last survey line was performed just upstream of the gauging weir crest, with the increase in velocity depicted in the measurement results.

Riaan van der Walt

Professional Engineering Technologist

6 年

I would also appreciate the full article.

回复
Chris Lloyd

Control Engineering Technician at Department: Water and Sanitation

6 年

Can you send me the full article please?

回复

要查看或添加评论,请登录

Daniel Wagenaar的更多文章

  • Suitability of Bridges for Streamflow Gauging's

    Suitability of Bridges for Streamflow Gauging's

    Suitability of Bridges for Streamflow Gauging's (select link above to download complete article) Bridges was an…

    7 条评论
  • Verifying of acoustic Doppler instruments

    Verifying of acoustic Doppler instruments

    If you are a single operator or part of a larger organization, it’s just a matter of time when the question will arise,…

  • Advancements on ADCP Operation at Vertical Walls

    Advancements on ADCP Operation at Vertical Walls

    Vertical and or steep banks can have a large impact on acoustic Doppler current profiler (ADCP) measurements as…

  • Effect of Vertical Banks on ADCP Measurements

    Effect of Vertical Banks on ADCP Measurements

    The effect of a vertical and or steep banks on Acoustic Doppler Current Meters using parallel pinging technique…

    1 条评论
  • Compensation for Dynamic Pressure Effects

    Compensation for Dynamic Pressure Effects

    The Bernoulli Principle is a standard concept in fluid dynamics, and is applied widely in aviation, hydraulics, and…

    1 条评论
  • Monitoring Programs

    Monitoring Programs

    The development of a monitoring program for surface water runoff, loads estimation, sediment transport, flood mapping…

  • Cross Section Surveys

    Cross Section Surveys

    The survey of cross sections of natural and artificial channels are a key component of hydrometry and surface water…

  • Edge Estimates – Alternatives!

    Edge Estimates – Alternatives!

    In previous discussion on edge estimates it was recommended to use your vessel dimensions (either manned or…

    4 条评论
  • Drone assisted Streamflow Gauging

    Drone assisted Streamflow Gauging

    Streamflow gauging's during high flow conditions or flood events is crucial for a wide range of operations within…

    1 条评论
  • Reference Water Level

    Reference Water Level

    It can certainly be argued which hydrometric data set is of significant importance! There are indications that our…

    3 条评论

社区洞察

其他会员也浏览了