Cleveland Clinic Martin South Ortho Suite
Edge Construction
Florida based Certified General Contractor striving to provide exemplary building construction services to every client.
Completion: September 2023 | Location: Stuart, FL
This 14,000 SF project consisted of the complete gut and rebuild of the entire first floor of a two-story medical office building. The scope of work included (18) Exam Rooms, (2) X-Ray Rooms, (4) Nurse’s Stations, (6) Offices, several Toilet Rooms, Conference Room, Rehab Suite, Staff Lounge and Waiting Area with check-in and check-out.
HVAC UPGRADES
A new HVAC System including equipment and controls was installed during this project. This new system exclusively serves the first floor Ortho Suite.
BUILDING LOGISTICS
The 2nd floor of the building remained completely operational throughout the entire construction process. This ensured minimal disruption for all patients and staff.
For more information about this project and others, visit our website at www.edgeconstruction-inc.com
For project pricing requests, please email [email protected].