Cleveland Clinic Martin South Ortho Suite

Cleveland Clinic Martin South Ortho Suite

Completion: September 2023 | Location: Stuart, FL

This 14,000 SF project consisted of the complete gut and rebuild of the entire first floor of a two-story medical office building. The scope of work included (18) Exam Rooms, (2) X-Ray Rooms, (4) Nurse’s Stations, (6) Offices, several Toilet Rooms, Conference Room, Rehab Suite, Staff Lounge and Waiting Area with check-in and check-out.

HVAC UPGRADES

A new HVAC System including equipment and controls was installed during this project. This new system exclusively serves the first floor Ortho Suite.

BUILDING LOGISTICS

The 2nd floor of the building remained completely operational throughout the entire construction process. This ensured minimal disruption for all patients and staff.


For more information about this project and others, visit our website at www.edgeconstruction-inc.com

For project pricing requests, please email [email protected].

Cleveland Clinic Florida

要查看或添加评论,请登录

Edge Construction的更多文章

社区洞察