Faster release cycles are one of the major advantages of microservices architectures. But without a good CI/CD process, you won't achieve the agility that microservices promise. This article describes the challenges and recommends some approaches to the problem.
What is CI/CD?
When we talk about CI/CD, we're really talking about several related processes: Continuous integration, continuous delivery, and continuous deployment.
Here are some goals of a robust CI/CD process for a microservices architecture:
Why a robust CI/CD pipeline matters?
In a traditional monolithic application, there is a single build pipeline whose output is the application executable. All development work feeds into this pipeline. If a high-priority bug is found, a fix must be integrated, tested, and published, which can delay the release of new features. You can mitigate these problems by having well-factored modules and using feature branches to minimize the impact of code changes. But as the application grows more complex, and more features are added, the release process for a monolith tends to become more brittle and likely to break.
Following the microservices philosophy, there should never be a long release train where every team has to get in line. The team that builds service "A" can release an update at any time, without waiting for changes in service "B" to be merged, tested, and deployed.
To achieve a high release velocity, your release pipeline must be automated and highly reliable to minimize risk. If you release to production one or more times daily, regressions or service disruptions must be rare. At the same time, if a bad update does get deployed, you must have a reliable way to quickly roll back or roll forward to a previous version of a service.
Challenges
Mitigation: Have a unified and automated pipeline to build and deploy services, so that this knowledge is not "hidden" within each team.
Mitigation: Containerize the build process for each service. That way, the build system just needs to be able to run the containers.
Mitigation: The more that your CI/CD process is automated and reliable, the less there should be a need for a central authority. That said, you might have different policies for releasing major feature updates versus minor bug fixes. Being decentralized doesn't mean zero governance.
Mitigation: Use deployment techniques such as blue-green or canary release for non- breaking changes. For breaking API changes, deploy the new version side by side with the previous version. That way, services that consume the previous API can be updated and tested for the new API. See Updating services, below.
Repository Design Consideration
Monorepo vs. multi-repo
Before creating a CI/CD workflow, you must know how the code base will be structured and managed.
The monorepo approach has been gaining favor but there are advantages and disadvantages to both
领英推荐
Updating services
There are various strategies for updating a service that's already in production. Here we discuss three common options: Rolling update, blue-green deployment, and canary release.
Rolling updates
In a rolling update, you deploy new instances of a service, and the new instances start receiving requests right away. As the new instances come up, the previous instances are removed.
Example. In Kubernetes, rolling updates are the default behavior when you update the pod spec for a Deployment. The Deployment controller creates a new ReplicaSet for the updated pods. Then it scales up the new ReplicaSet while scaling down the old one, to maintain the desired replica count. It doesn't delete old pods until the new ones are ready. Kubernetes keeps a history of the update, so you can roll back an update if needed.
Example. Azure Service Fabric uses the rolling update strategy by default. This strategy is best suited for deploying a version of a service with new features without changing existing APIs. Service Fabric starts an upgrade deployment by updating the application type to a subset of the nodes or an update domain. It then rolls forward to the next update domain until all domains are upgraded. If an upgrade domain fails to update, the application type rolls back to the previous version across all domains. Be aware that an application type with multiple services (and if all services are updated as part of one upgrade deployment) is prone to failure. If one service fails to update, the entire application is rolled back to the previous version and the other services are not updated.
One challenge of rolling updates is that during the update process, a mix of old and new versions are running and receiving traffic. During this period, any request could get routed to either of the two versions.
For breaking API changes, a good practice is to support both versions side by side, until all clients of the previous version are updated. See API versioning.
Blue-green deployment
In a blue-green deployment, you deploy the new version alongside the previous version. After you validate the new version, you switch all traffic at once from the previous version to the new version. After the switch, you monitor the application for any problems. If something goes wrong, you can swap back to the old version. Assuming there are no problems, you can delete the old version.
With a more traditional monolithic or N-tier application, blue-green deployment generally meant provisioning two identical environments. You would deploy the new version to a staging environment, then redirect client traffic to the staging environment — for example, by swapping VIP addresses. In a microservices architecture, updates happen at the microservice level, so you would typically deploy the update into the same environment and use a service discovery mechanism to swap.
Example. In Kubernetes, you don't need to provision a separate cluster to do blue-green deployments. Instead, you can take advantage of selectors. Create a new Deployment resource with a new pod spec and a different set of labels. Create this deployment, without deleting the previous deployment or modifying the service that points to it. Once the new pods are running, you can update the service's selector to match the new deployment.
One drawback of blue-green deployment is that during the update, you are running twice as many pods for the service (current and next). If the pods require a lot of CPU or memory resources, you may need to scale out the cluster temporarily to handle the resource consumption.
Canary release
In a canary release, you roll out an updated version to a small number of clients. Then you monitor the behavior of the new service before rolling it out to all clients. This lets you do a slow rollout in a controlled fashion, observe real data, and spot problems before all customers are affected.
A canary release is more complex to manage than either blue-green or rolling update, because you must dynamically route requests to different versions of the service.
Example. In Kubernetes, you can configure a Service to span two replica sets (one for each version) and adjust the replica counts manually. However, this approach is rather coarse-grained, because of the way Kubernetes load balances across pods. For example, if you have a total of 10 replicas, you can only shift traffic in 10% increments. If you are using a service mesh, you can use the service mesh routing rules to implement a more sophisticated canary release strategy.