Changes in the design of the suspended VENTUS Compact VVS005s air handling unit
Dear All,
We would like to inform you that there have been changes in the design of the suspended VENTUS Compact VVS005s air handling unit. The base of the air handling unit has been redesigned, and it is now available in two versions - with a built-in secondary water heater and without a heater.
This configuration reduces the overall length of the unit as well as its weight. For example, in the FPVH/FPV configuration (with a water heater), the length is reduced by 100 mm and the weight is reduced by 8%.
The bypass damper has also been changed to optimize the unit's internal space.
If you are interested in a quotation, please contact us: https://vtsgroup.com/contact
You can find more technical information about VVS005s here (page 16). - https://vtsgroup.com/files/document-files/3750/Brochure_VENTUS%20Compact_EN_net.pdf
PMP, PQP, DM Approved Mechanical Engineer, Trakhees Approved Mech Engr etc
10 个月Good work, above ceilling always had space issue for FCUs and suspended Air Handling Units, Well done.