Change and Cost Management on Infrastructure Projects
Cecelia Fadipe (FCMA)
Director | Independent Auditor | Strategy & Business Advisor | Fellow Management Accounting | CIMA-AICPA Sustainability R&D Committee Member | Chair Multi-disciplinary Steering Group | Public Speaker | Guest Lecturer
"According to a study by the Project Management Institute (PMI), 52% of infrastructure projects experience scope changes, resulting in an average cost increase of 24%. Clear change management strategies, including precise scope definition and continuous risk assessments, help control costs and maintain project timelines.?"
OVERVIEW
Infrastructure projects, such as the construction of roads, bridges, railways, airports, energy grids, and public facilities, that are essential for economic growth and development. These large-scale, capital-intensive projects play a critical role in economic prosperity by enhancing connectivity, supporting industry, and providing essential public services. Infrastructure projects are central to the functioning of a modern society, driving both short-term job creation and long-term economic and employment benefits. The sheer size and complexity of these projects, however introduce a range of challenges, particularly managing change and cost risks.
INTRODUCTION
Infrastructure projects are highly complex and often capital- intensive, requiring careful planning, execution, and long-term management. A single infrastructure project might involve billions of pounds and include multiple stakeholders such as government agencies, private investors, contractors, engineers, architects, and the local communities that will be impacted. The size and scope of these projects mean that they carry significant risks, particularly concerning cost overruns, delays, and changes in project scope.
This complexity makes both cost management and change management indispensable elements of any major infrastructure project. These two project management strategies should be deployed together seamlessly to safeguard a project's success.
Change management or control is the process through which requests to change an approved baseline programme plan are captured, evaluated for feasibility, risk, impact or financial viability and then approved, rejected or deferred. On infrastructure projects, change management is essential due to multiple variables that can disrupt the original project scope, timeline, or budget. Change control is of particular importance where a project is part of a larger programme because the consequential impactof unmanaged change will be significant due to dependencies.
Cost Management is a primary function of project managers when integrated with scope, quality and time management, the three functions form the core of project management. The cost management must be a primary focus at every stage throughout a project lifecycle. Of the key reason for the success of a project, cost management is the most important as all project aspects affect this function. Cost management helps to ensure that financial resources are allocated efficiently and effectively, controlling project expenditure throughout the project lifecycle from the planning stage through to project completion.?
UNDERSTANDING INFRASTRUCTURE PROJECTS
"According to research from the Project Management Institute, projects that implement robust change management protocols are 20% more likely to achieve budget targets compared to those without these practices."
Infrastructure projects are complex, large-scale undertakings that provide essential services crucial to the functioning of modern society. These projects encompass a wide array of services, including transportation systems, energy generation and distribution, water supply and treatment, waste management, and public facilities such as schools and hospitals. Given their importance, infrastructure projects are generally viewed as the backbone of economic and social development, enabling both immediate needs like employment and long-term growth.
Typically, these projects require significant capital investment and are undertaken by various entities, including government agencies, private companies, or public-private partnerships (PPPs). The involvement of multiple stakeholders often complicates project execution, as each party may have different objectives, priorities, and perspectives. This multifaceted nature of infrastructure projects means that they require a comprehensive approach to management, particularly concerning planning, design, construction, and operations.
CHALLENGES
The scale and complexity of infrastructure?projects?render?them susceptible to unforeseen risks. Common challenges include:
Given these challenges, effective change and cost management are essential components of successful infrastructure project delivery. By integrating these processes, project managers can better navigate the complexities of execution, ensuring that projects can achieve planned objectives for stakeholders and end-users in a timely and cost-effective manner.
IMPORTANCE OF CHANGE MANAGEMENT
"According to the Project Management Institute’s (PMI) ‘Pulse of Profession” report, 45% of projects experience cost overruns, with an average overrun of 30%."
Change management is a vital process on infrastructure projects, involving structured methodologies for managing alterations in project scope, design, or resources. Given the inherent dynamic nature of infrastructure development, change is not merely probable; it is often inevitable. Change on projects can be initiated by internal or external factors, including regulatory updates, stakeholder demands, environmental considerations, or technological advancements.
The successful implementation of project change management ensures that projects are carefully evaluated against change requests while minimising disruption to timelines and budgets. A robust change management process typically consists of several critical components:
Key?benefits?of?effective?change?management on infrastructure projects include:
CORE PRINCIPLES OF COST MANAGEMENT
"A Chartered Institute of Building report (2022) similarly stated that 70% of infrastructure projects experiencing cost overruns are due to inaccurate initial cost estimation and insufficient financial monitoring."
Cost?management?encompasses?the?systematic?approach?to planning,?budgeting,??????? and?controlling?project?costs?to?maintain?financial viability. Effective cost management is essential for avoiding financial losses and that projects deliver value within the agreed budget. The core principles of cost management include:
Cost Estimation
Cost estimation is the foundational phase of cost management, involving the prediction of the financial resources required for the successful delivery of a project. This process is multifaceted and requires the planning of various cost components:
Stakeholder Communication
A well-defined budget facilitates communication among stakeholders by outlining financial commitments and expectations. Transparency and accountability with budgeting helps in securing stakeholder buy-in and funding.
Cost Control
Cost control is a continuous process of monitoring actual expenditure against planned budget throughout the project lifecycle. The main objectives include:
PLANNING AND BUDGETING TO PREVENT COST OVERRUNS
In the UK, HS2 a major infrastructure project reported a 20% budget increase due to environmental conditions. This case emphasises the importance of thorough and accurate budgeting during the planning stage (UK National Audit Office, 2023).
Planning and Budgeting to Prevent Cost Overruns
Effective planning and budgeting are critical strategies for preventing cost overruns in infrastructure projects. Initiating projects with precise cost estimates and well-structured budgets is essential, as these elements lay the groundwork for financial control and project success. Both direct and indirect costs must be considered, including operational and maintenance expenses that may arise over the project’s lifecycle.
Planning Phase
Planning involves defining clear project objectives, scope, and resource requirements. This phase is vital for establishing a solid foundation for the project. Breaking the project down into smaller, manageable components enhances the accuracy of resource allocation and provides clearer visibility into potential risks or bottlenecks. Key elements of the planning process include:
A crucial aspect of planning is contingency allocation. By setting aside a portion of the budget for unexpected costs, project managers can maintain flexibility and adaptability. This allocation serves as a financial buffer, allowing the project to absorb unforeseen expenses without jeopardizing overall financial stability.
Budgeting Phase
Following the planning phase, budgeting involves the systematic allocation of financial resources across various project tasks. An effective budget serves as a financial roadmap, guiding expenditures and ensuring alignment with project goals. Techniques that can enhance budgeting practices include:
In summary, effective planning and budgeting are indispensable in preventing cost overruns in infrastructure projects. By initiating projects with accurate cost estimates, breaking down the work into manageable components, and employing advanced budgeting techniques, project managers can significantly enhance financial control, ensure resource efficiency, and ultimately contribute to the successful delivery of projects.
RISK MANAGEMENT IN INFRASTRUCTURE PROJECTS
"A 2023 report by McKinsey & Company highlights that around 70% of large infrastructure projects encounter cost overruns due to poorly managed scope changes and unforeseen risks."
Risk management plays a pivotal role in both change and cost management for infrastructure projects. The inherent complexities and uncertainties of such projects necessitate a proactive approach to identifying, assessing, and mitigating risks. By addressing potential risks early in the project lifecycle, teams can implement strategies to prevent these issues from adversely affecting the project’s budget, timeline, or overall success.
Key Elements of Risk Management
Risk Assessment
After identifying risks, the next step is to assess their likelihood of occurrence and potential impact on the project. This assessment can be qualitative, involving subjective evaluations, or quantitative, using statistical methods like Monte Carlo simulations. These simulations allow teams to model various scenarios and predict potential cost overruns and schedule impacts.
A risk matrix can also be developed to visualize the relationship between the likelihood and impact of each risk. This tool helps prioritize risks, enabling teams to focus on the most critical ones.
Risk Mitigation
Once risks are assessed, the next step is to implement mitigation strategies aimed at minimizing their likelihood or impact. Effective strategies include:
Risk Identification
The first step in effective risk management is the identification of potential risks that could impact the project’s financial or operational viability. Risks can be broadly categorised into two types:
Monitoring and Review
Risk management is an ongoing process that requires regular monitoring and review throughout the project’s lifecycle. Reassessing the risk management plan ensures that new risks are identified and existing ones are updated based on changing circumstances.
Conducting lessons-learned sessions after key milestones helps evaluate the effectiveness of risk strategies and refine future approaches.?
TOOLS FOR CHANGE AND COST CONTROL
According to a PwC study (2020), "infrastructure projects using earned value management tools are 60% more likely to meet both budget and schedule targets."
Project managers in infrastructure projects have access to various tools that facilitate effective control of both changes and costs. These tools not only enhance visibility into the project's financial health but also improve management of scope changes and unexpected expenses.
Earned Value Management (EVM)
EVM is a vital tool that integrates cost, scope, and schedule to assess project performance comprehensively. By comparing the planned value, earned value, and actual costs, project managers can gauge project progress. This allows them to identify trends and forecast potential cost overruns early in the project lifecycle. EVM also facilitates informed decision-making regarding resource allocation and timeline adjustments.
Building Information Modelling (BIM)
BIM represents a significant advancement in project management, allowing for a detailed digital representation of a project's physical and functional characteristics. This technology supports real-time collaboration among stakeholders, enabling project teams to simulate various scenarios and assess the impacts of potential changes before implementation. By visualising project elements, teams can reduce the risks of rework and unnecessary costs, thereby enhancing overall efficiency.
?Project Management Software
Tools like Microsoft Project, Aconex, and Oracle Primavera are indispensable for project managers. They help track project progress, allocate resources effectively, and manage timelines with precision. These platforms provide real-time data on project performance, enabling managers to identify potential budget overruns and adjust plans proactively. Their integration with other systems further streamlines communication and reporting across the project team.
Cost Control Systems
Advanced software tools such as SAP Project System and Oracle Cost Management play a crucial role in monitoring expenses in real time. These systems offer predictive insights into potential cost overruns, allowing project managers to implement corrective measures before issues escalate. By ensuring that resources are allocated efficiently, these tools support better financial planning and enhance the overall success of infrastructure projects.
In summary, leveraging these tools enables project managers to maintain tighter control over changes and costs, ultimately leading to more successful project outcomes.?
THE ROLE OF TECHNOLOGY IN INFRASTRUCTURE MANAGEMENT
The UK Department for Business, Energy & Industrial Strategy (2021) found that "infrastructure projects that adopted predictive analytics saw a 20% reduction in cost overruns and a 25% decrease in project timelines.
The adoption of modern technology plays a critical role in streamlining cost and change management in infrastructure projects. As the complexity and scale of these projects continue to grow, technological tools have become indispensable for project managers, enabling them to track, analyze, and forecast changes and costs with enhanced precision. This ensures that projects remain on course, ultimately increasing their likelihood of success and stakeholder satisfaction.
Artificial Intelligence (AI) and Machine Learning (ML)
AI and ML are revolutionising the management of infrastructure projects by providing advanced analytical capabilities. AI tools can sift through vast amounts of historical data to predict potential cost overruns, allowing project managers to take preemptive actions before issues arise. These tools can identify patterns and trends indicative of financial risks, enabling teams to address concerns proactively rather than reactively. Meanwhile, ML algorithms continuously refine cost estimates and forecasts based on incoming data, leading to improved budgeting accuracy as the project progresses.
Predictive analytics, a key component of AI, plays a vital role in assessing project risks. By evaluating real-time data, these tools can forecast the likelihood of delays or budget deviations, empowering project managers to make informed adjustments to timelines, resource allocations, and project scopes. This capability not only helps mitigate risks but also enhances overall project performance, ensuring that objectives are met within desired timeframes and budgets.?
Digital Twins
Digital twins represent another significant technological advancement in infrastructure management. These virtual replicas of physical assets provide project managers with a powerful tool to simulate various scenarios and assess their potential impacts. With digital twins, teams can experiment with design changes in a controlled virtual environment, gaining insights into how modifications might affect project costs, timelines, and operational efficiency.
By running various "what-if" scenarios, project teams can anticipate challenges and develop strategies to address issues before they escalate. This proactive approach reduces the risk of costly delays and budget overruns, as teams can identify and mitigate potential problems in advance. Moreover, digital twins enhance communication among stakeholders by offering a clear visual representation of the project's status and future projections, facilitating informed decision-making and collaboration.
Collaborative Platforms and Real-Time Data Sharing
In addition to AI and digital twins, collaborative platforms and real- time data-sharing tools are transforming how project teams work together. These technologies allow for seamless communication among team members, stakeholders, and contractors, ensuring everyone is on the same page. Real-time data sharing enables quick updates on project progress, changes, and challenges, reducing misunderstandings and improving overall project coordination.
STAKEHOLDER ENGAGEMENT IN INFRASTRUCTURE PROJECTS
A 2022 study by the Project Management Institute (PMI) highlighted that "projects with high levels of stakeholder engagement were 50% more likely to stay within budget and meet deadlines."
Clear Communication
Transparent?and consistent?communication forms the backbone of successful stakeholder engagement. It is essential to keep stakeholders informed about project developments, challenges, and opportunities for their input. Utilising effective communication platforms, such as project dashboards or regular updates through newsletters, can provide stakeholders with real- time insights into project progress. This fosters a culture of collaboration and reduces the risk of misunderstandings, allowing for quicker resolution of potential issues as they arise.
Stakeholder engagement is paramount to the success of infrastructure projects, especially in the context of managing changes and costs. Given the complexity and scale of such projects, they often involve a diverse array of stakeholders, including government agencies, private investors, local communities, contractors, and regulatory bodies. Each group possesses distinct interests and priorities, and any misalignment among these stakeholders can result in significant delays, unplanned scope changes, and increased project costs.
Effective stakeholder?engagement?can be broken down?into several key components:
Early Involvement
Engaging stakeholders from the very beginning of the project is crucial. This proactive approach ensures that the expectations, concerns, and insights of all relevant parties are considered during the planning and design phases. Early involvement helps to build trust and transparency, thereby reducing the likelihood of significant changes or conflicts arising later on. For instance, community feedback gathered during the early stages can inform project design, ultimately leading to solutions that are more acceptable to local populations and minimising opposition.
Managing Expectations
A critical element of stakeholder engagement is managing expectations effectively. Project managers must align stakeholders’ expectations with the project's goals, timelines, and constraints. This involves openly discussing what is feasible within the project's scope and budget, as well as potential limitations. By setting realistic expectations early on, project managers can mitigate the risks of disputes and costly scope changes that often arise from misunderstandings. Regular updates and discussions can help ensure that stakeholders remain aligned with the project's objectives throughout its lifecycle.
Feedback Mechanisms
Structured feedback mechanisms, such as surveys or focus groups, allow stakeholders to voice concerns and suggestions. Actively seeking input demonstrates a commitment to engagement and can lead to greater support for the project.
Conflict Resolution
Establishing clear protocols for conflict resolution helps manage disagreements before they escalate. Fostering open dialogue can navigate potential disputes effectively.
CHALLENGES IN IMPLEMENTING CHANGE
According to the Royal Institute of Chartered Surveyors (RICS) 2023 report, “46% of infrastructure projects that failed to meet their objectives did so due to insufficient leadership during change management.
Implementing change within infrastructure projects is essential but often fraught with challenges. Understanding these barriers can help project managers develop strategies to navigate them effectively.
Communication
Effective communication is vital to the success of change management. A lack of clear communication can lead to misunderstandings, duplicated efforts, and missed opportunities to resolve issues before they escalate. Project managers should establish well-defined communication channels that facilitate information flow among all stakeholders. Regular updates, feedback sessions, and transparent discussions about challenges and progress can ensure that everyone is aligned and informed.
Resistance to Change
Resistance from team members is one of the most significant challenges in large-scale projects. Employees may perceive changes as burdensome, fearing increased workloads or uncertainty about how their roles might shift. This resistance can lead to lower morale and decreased productivity. To mitigate this challenge, project managers should proactively engage team members from the outset. Providing comprehensive training and resources can help them understand the rationale behind the changes and how they can benefit both the project and their individual roles. Creating a culture of openness where team members feel valued and heard can also alleviate resistance.
Leadership
Strong leadership is crucial for the successful management of change. Leaders must be visible champions of the change initiative, effectively communicating a clear vision that outlines the objectives and benefits of the change. Without clear leadership, changes can become disorganized, leading to confusion and delays in implementation. Leaders should also ensure that all team members understand their specific roles in the change process, fostering a sense of ownership and accountability.
Cultural Barriers
Organizational culture can also pose challenges to implementing change. If the existing culture resists innovation or is risk-averse, introducing new processes or technologies may face significant hurdles. Project managers should assess the organizational culture and identify potential cultural shifts that may be needed to support the change.
Inadequate Resources
Limited resources - whether financial, human, or technological— can hinder the change process. Project managers must conduct a thorough assessment of resource availability and develop a plan to allocate resources effectively. This may include securing additional funding, hiring new personnel, or leveraging technology to support the change initiatives.
SUSTAINABLE COST MANAGEMENT PRACTICES
According to a 2022 report by the UK Green Building Council, "projects that implemented sustainability-focused cost management practices saw a 25% reduction in operational costs over the lifecycle of the project."
Circular Economy Principles
Sustainability is becoming increasingly vital in the cost management of infrastructure projects. Sustainable cost management involves integrating environmental and social considerations into budgeting and resource allocation, allowing project managers to evaluate the long-term impacts of their projects on both the environment and the community. This approach not only enhances project viability but also ensures that projects contribute positively to society over time.
Green Building Certifications
One significant aspect of sustainable cost management is the pursuit of green building certifications such as BREEAM (Building Research Establishment Environmental Assessment Method) and LEED (Leadership in Energy and Environmental Design). These certifications help infrastructure projects achieve sustainability goals while improving overall cost efficiency. By promoting the use of energy-efficient materials, renewable resources, and sustainable construction practices, these certifications can lead to significant reductions in operational costs over the project's lifespan. Projects that achieve such certifications often enjoy lower utility bills, enhanced occupant satisfaction, and increased marketability, ultimately resulting in better returns on investment.
Adopting circular economy principles is essential for sustainable infrastructure. This approach focuses on reusing waste materials, which minimizes environmental impact and reduces costs. For instance, using recycled materials lowers disposal expenses and decreases the demand for virgin resources, encouraging innovative designs that enhance resource conservation.
Lifecycle Costing
Lifecycle costing (LCC) evaluates both initial investments and long- term operational expenses, enabling informed decisions that balance costs and environmental impacts. Projects that invest more in sustainable materials may save on maintenance and energy costs over time, aligning financial choices with sustainability goals.
Sustainable Procurement Practices
Implementing sustainable procurement practices enhances cost management by prioritizing suppliers who meet environmental and social standards. This includes sourcing materials locally to reduce transportation emissions and choosing ethical vendors, leading to cost savings and improved supply chain efficiencies.
Stakeholder Engagement in Sustainability
Early stakeholder engagement is vital for successful sustainability efforts. Involving local communities and governments ensures projects address their needs, fostering transparency and trust while mitigating conflicts. Stakeholder feedback also provides insights that enhance sustainable design and operations.
FUTURE TRENDS IN CHANGE AND COST MANAGEMENT
In 2023, RICS predicted that "by 2030, AI adoption in cost management will increase by 50%, leading to more efficient and accurate cost forecasting in infrastructure projects."
The future of change and cost management in infrastructure projects will be profoundly influenced by technological advancements and evolving sustainability requirements. With rising global awareness of climate change and the need for resilient infrastructure, project managers must adapt to emerging trends and tools to ensure project success.
AI-Based Forecasting Models
AI-based forecasting models will continue to evolve, offering increasingly accurate predictions of cost overruns and schedule delays based on real-time data. These sophisticated AI tools will not only forecast financial risks but also identify inefficiencies in project processes, enabling teams to make proactive adjustments. By analyzing vast datasets, AI can provide insights that help optimize resource allocation and improve overall project efficiency.
Digital Twins
The use of digital twins will become more widespread, allowing project teams to create virtual replicas of physical infrastructure. This technology enables the simulation of various scenarios, including design changes, material substitutions, and responses to external disruptions. By evaluating these scenarios in a virtual environment, teams can make more informed decisions that reduce the risk of cost overruns and ensure smoother implementation of changes. Digital twins facilitate real-time monitoring and adjustments, enhancing the resilience of infrastructure projects.
Integration of Sustainability Metrics
As governments and organizations increasingly emphasize reducing carbon emissions and promoting environmental stewardship, infrastructure projects will need to integrate sustainability metrics into their cost management strategies. This will involve evaluating not only financial costs but also the environmental and social impacts of decisions. Project managers will be tasked with ensuring that sustainability considerations are embedded in every phase of the project, from planning and budgeting to execution and monitoring. By prioritizing sustainable practices, projects can contribute to broader environmental goals while also enhancing their long-term viability and community acceptance.
Collaborative Platforms
The future will likely see an increase in collaborative platforms that facilitate stakeholder engagement and communication throughout the project lifecycle. These platforms will enable real- time collaboration among stakeholders, ensuring that all parties are aligned and informed. Enhanced transparency can lead to better decision-making and quicker resolution of issues, ultimately supporting more efficient change management and cost control.
In summary, the future of change and cost management in infrastructure projects will be characterized by advanced technologies, a strong emphasis on sustainability, and improved collaboration. By embracing these trends, project managers can navigate the complexities of modern infrastructure challenges and deliver successful outcomes that benefit both communities and the environment.
FREQUENTLY ASKED QUESTIONS (FAQS)
According to a study published by the McKinsey Global Institute, around 70% of large infrastructure projects experience cost overruns, with an average increase of 20% to 50% over the original budget.?
Q1: What is the key to effective cost management?
A: Accurate cost estimation, continuous monitoring, and contingency planning are crucial elements of effective cost management in infrastructure projects. By ensuring that all potential expenses are forecasted and accounted for, project managers can avoid budget overruns and ensure financial stability.
Q2: How does technology impact change management?
A: Technology, such as BIM and AI-based forecasting tools, significantly improves change management by providing real-time data and predictive insights. This enables project teams to assess the impact of changes quickly and make informed decisions to minimise disruptions and cost increases.
Q3: What are the benefits of stakeholder engagement in infrastructure projects?
A: Stakeholder engagement ensures alignment on project goals, reduces the risk of miscommunication, and helps secure buy-in from all parties involved. By involving stakeholders in key decisions, project managers can avoid delays, improve decision-making, and ensure that the project meets its objectives.
Q4: Why is risk management important in infrastructure projects?
A: Risk management helps project teams identify, assess, and mitigate potential risks that could lead to financial overruns or schedule delays. By proactively managing risks, infrastructure projects are more likely to stay within budget and meet their deadlines.
Q5: What is Earned Value Management (EVM)?
A: Earned Value Management is a project management technique that integrates scope, schedule, and cost to assess project performance. It allows project managers to compare planned versus actual progress and predict future performance based on current trends.
Q6: How can sustainability be integrated into cost management?
A: Sustainable cost management includes the use of eco- friendly materials, energy-efficient designs, and lifecycle costing to minimise long-term environmental impacts and operational expenses. Green certifications like BREEAM or LEED provide frameworks for integrating sustainability into cost management.
Q7: What role does AI play in cost management?
A: AI plays a significant role in forecasting costs and predicting potential overruns by analysing historical data and current trends. Machine learning algorithms can improve the accuracy of predictions and enable project teams to make data-driven decisions in real time.
Q8: How does digital twin technology help in infrastructure projects?
A: Digital twins enable project teams to simulate real-world scenarios and assess the impact of design changes, material choices, or environmental factors before implementation. This helps in preventing costly mistakes and allows for better-informed decision-making.
Q9: What is contingency planning, and why is it important?
A: Contingency planning involves setting aside financial resources to cover unexpected costs that may arise during a project. It ensures that the project remains financially viable even when unforeseen expenses occur, reducing the risk of budget overruns.
Q10: What are the main challenges in implementing change management?
A: Key challenges include resistance from team members, lack of clear leadership, and communication breakdowns. Overcoming these barriers requires strong leadership, clear communication, and engaging stakeholders early in the process.
Q11: How does lifecycle costing benefit infrastructure projects?
A: Lifecycle costing considers both initial capital investment and long-term operational and maintenance expenses, enabling project managers to make decisions that reduce total costs and minimise environmental impact over the project's lifespan.
Q12: What are the future trends in cost management?
A: The future of cost management will be driven by AI-based forecasting, digital twin technology, and increased integration of sustainability metrics. These advancements will lead to more accurate cost predictions, better change management, and more sustainable infrastructure projects.
THE PROBLEM
I know that 85% of project cost overruns are due to a breakdown of controls while most businesses fail due to poor strategic planning, financial controls and lack of resilience. This is from my experience as an independent cost auditor and consultant backed up by data and evidence from several major infrastructure projects and business case studies.
THE SOLUTION
My proven methodology cuts across people, processes, control systems, and the contract and is a personalised approach that helps project and business leaders achieve their strategic commercial and financial goals for the long term.
OUR SERVICES
Infrastructure Project Services
OTHER SERVICES
"Our personalised independent approach supports your cost assurance strategy. By placing sustainability at the heart of our activities, we support leaders on infrastructure projects with their cost assurance strategy and innovative businesses with a sustainable financial strategy. This leverages 25 years of experience across commercial, finance and project control functions and as auditors. CFBL helps to optimise cost, minimise risks and maximise value sustainably through our services."
HOW CAN CFBL CONSULTING HELP?
CFBL consulting supports leaders on major infrastructure projects with their cost assurance strategy. We help implement a cost-assurance and sustainable strategic business plan. Our infrastructure project services involve independent pre-audit diagnostic and forensic deep-dive final account audits. This includes delivering a rolling programme of audits, a project audit team and cost assurance protocols training internally and for the supply chain.
Our added value involves an initial ESG diagnostic assessment, carbon cost, payroll and ESG audit to prevent or evidence greenwashing, strategic business planning and transformation advisory. This includes practical ESG finance training and decarbonisation investment modelling and business case. We govern and assure ESG and sustainable data and provide sustainable strategy advisory. Our multi-disciplinary steering group for cost assurance and audit comprises experts who are driving industry-wide change and transformation.REFERENCES
This comprehensive overview addresses the multifaceted aspects of change and cost management in infrastructure projects, providing insights into practices, tools, and emerging trends that will shape the future of project management.
REFERENCES
DETAILS
You can contact us using the phone numbers below or email to find out how we can help any of your projects or supply chain teams. Alternatively, you can schedule a proposal / walk-through meeting in two clicks via https://calendly.com/cecelia-fadipe
T: +44 1737452323
M: +44 7951722554
BA (Hons) Business Management Undergraduate of Bloomsbury Institute / Business Development Trainee
1 个月Fantastic newsletter! It’s packed with valuable insights and information that really resonate with the current challenges in our industry. I appreciate the clarity and depth of the content. Keep up the great work!