Case Study: Optimising Hybrid
Battery Performance.

Case Study: Optimising Hybrid Battery Performance.

Summary?

A major construction company operating from a three-cabin site set up,?powered by a 30kVa Solar Hybrid Unit, was seeking to reduce power consumption?and maximise battery performance.?

Maximise Battery Performance Enabling Silent Night Operation.

What was done??

The erica site distribution board was connected from the solar hybrid unit to each cabin.?The site working hours were programmed into the erica board, which turned off?power where not required in the drying rooms, offices & canteen.?

What difference did this make??

The reduction in power wastage led to a 68% increase in the number of hours?the site operated on the battery (68 hours per week to 114 hours).?

The graph below shows battery performance prior to and after erica was installed.?

No alt text provided for this image
Graph 1

Controlling the site power enabled the?solar hybrid unit to?provide 100% silent site power operations at night.?

Note: Battery data provided by Solar Hybrid unit manufacturer.?

Learn more about Erica: www.idesystems.co.uk/erica