Case Study: Deploying FAST in the GCC
FAST Technology Solutions
A revolution for stabiliser reaming - saving time, money and delivering performance
Learn about the first introduction of Friction Adjustable Stabiliser Technology (FAST) in the GCC region.
Challenge
The following challenges were observed.
Outlined success criteria
What we did
After identifying the challenges being faced on offshore drilling operations, a planned trial of FAST was scheduled.?
The trial process was broken down as follows:
Preparation
Execution
Evaluation
○ Review BHA performance (drilling) & vibration
○ Review trip-out performance
○ Review performance for RIH casing or lower completion
领英推荐
Why FAST?
FAST tool diminishes the risk of BHA damage so that you can reduce rig costs and deliver your project on time. By maximising penetration rate and curtailing reaming time, FAST ensures that you minimise your flat time.
FAST is designed with the following features to address critical industry challenges, such as those experienced in this project.
Results
Health & Safety Environment
Performance
Efficiency
○ 48 hours saved – corresponding to the average NPT for tripping out the BHA following a BHA component failure.
○ 9.6 hours saved – corresponding to the trip-out performance in 6″ hole section is improved by achieving higher than P10 speed (292 ft/hr).
FAST continues to deliver benefits to the client with two additional trial runs since this review.