Case Study: Best on Deck - Issue #2
SuperDeck? 3.2

Case Study: Best on Deck - Issue #2

Preston Rentals recent installs of our SuperDeck? retractable loading platform system?

This past month we helped more customers complete their large-scale projects using our standout SuperDeck? retractable loading platform system…?


Our SuperDecks Elevate Bellevue High-Rise Project – SuperDeck? 3.2?

Mortenson Construction once again turned to Preston Rentals to address their material handling needs on a high-rise project in Bellevue, Washington. They needed a way to load bulky, prefabricated modules into a 12-story, mixed-use building. We supplied two units of our 3.2 SuperDecks as they perfectly accommodated the size and weight of the modules, being able to bear loads up to 11,000lbs. Stacked one above the other, and able to be retracted, these SuperDecks will streamline material handling and free up precious crane time on site over the next 3-4 months. Our ability to offer tailored solutions that address the specific challenges faced in multi-level construction continues to strengthen our partnership with Mortenson Construction.??

Preston Rentals offers “capitol” solution for JE Dunn – SuperDeck? 3.2?

One of the largest general contractors in the US, JE Dunn Construction, required a material handling solution for their ambitious project across from the Minnesota State Capitol. This half-a-billion-dollar government construction project aims to renovate and expand the historic Minnesota State Office Building, addressing critical infrastructure, security, and accessibility issues. Facing the challenge of needing to load materials into the building, JE Dunn Construction was looking for a robust and versatile solution. Preston Rentals recommended three of our SuperDeck? 3.2s and strategically positioned them for maximum efficiency. These decks will be on-site for the next year, ensuring smooth and efficient loading operations as the building progresses...

[Read the full case study here]?


Maeda MC305C

Article: Common Challenges During HVAC Unit Installations and?How a Mini Crane Can Solve Them?

Installing HVAC units often comes with a host of challenges—tight spaces, heavy lifting, and safety concerns can turn a straightforward job into a logistical nightmare. These issues not only delay projects but also increase labor costs and risk worker injuries. But what if there was HVAC lifting equipment that could streamline installations and mitigate their associated risks? Enter the mini crane – a compact, yet powerful machine purposely designed for heavy lifting in restricted spaces.??

In this article, we’ll explore the common challenges faced during HVAC unit installations and how renting a mini crane from Preston Rentals can solve them.?

?

Typical obstacles in HVAC system installations?

Installing HVAC units presents several common challenges that can complicate the process and lead to inefficiencies. Here are some of the most frequent issues faced by HVAC contractors and installation teams:?

  • Space constraints and accessibility issues??

HVAC units often need to be installed in tight, hard-to-reach areas such as rooftops, basements, or narrow utility rooms. Maneuvering large, heavy units into these spaces can be extremely difficult and time-consuming. As a result, contractors and installation teams are frequently on the lookout for HVAC lifting equipment that can solve these challenges.??

  • Safety concerns during installations??

Safety is always a priority on any job site, but the risk of accidents and injuries increases when dealing with heavy HVAC units in confined spaces. Workers are at risk of strains, falls, and other injuries, when lifting ac units off the ground and positioning for installation. Air conditioning lifting equipment, like a mini crane, dramatically reduces the likelihood of accidents by replacing physical strain with mechanical lifting.?

  • Time-consuming and labor-intensive processes?

Traditional methods of installing HVAC units often involve multiple workers, complex rigging systems, and lengthy preparation times. This can make the installation process labor-intensive and time consuming, leading to project delays and increased costs...

[Read the full article here]