The frustration and discomfort hung in the room. I had an overwhelming desire to disappear into the wall, but I couldn't. I was stuck.

It was sometime in late 2011. My team and I were about 9 months deep into a website redesign project. We were enduring the latest in a series of humiliating calls with the client to talk through how the alpha site wasn't meeting expectations, key functionality was missing, other functionality wasn't working up to their standards.

At the end of the call, we pushed the site launch date back another 30 days in hopes of getting the fixes sorted by then.

But, regardless of whether we made that launch date, the damage had already been done:

  • The client didn't trust us to deliver on our promises anymore
  • The client project team had lost the trust of their senior leadership
  • The website, regardless of the amazing improvement it would be when it finally went live, would always be viewed as a failure by the client
No alt text provided for this image

What (failed) Website Projects Teach Us

If you've ever built a website with a typical 4-12 month process you likely can tell a story of missed launch dates, budget overruns, and compromises on functionality. Hopefully your experience wasn't as bad as the one above.

Months-long web design projects are terribly difficult to manage effectively in a way that meets the goals and desires of all involved. It can be done well, but the complete success of this type of project is rare.

There's a 5 reasons for this:

  1. A Once Ever Two Years Redesign Mentality Cripples Us: The typical website redesign is completed once every couple years. Between the redesigns the site sits dormant except for minimal maintenance. This puts a lot of pressure on the redesign process, turning it into a much larger stressor than it needs to be.
  2. Divorcing The Site Build From Feedback Loops Removes Perspective: A long site build process means that unless you conduct consistent usability testing every design, content, and development decision is made in a vacuum, driven by the whims of the most experienced person in the room. That person likely knows a lot, but probably aren't your target audience.
  3. Budgeting Ahead Of Time For Unforeseen Functionality Is Near To Impossible: Over the course of a long redesign process, new functionality is dreamt up at every step of the way. This means that your budget becomes a nightmare, as do your timelines.
  4. Lack Of Immediate Launch Timelines Brings Out The Worst In Us: There's also the issue of efficiency. As humans we respond to the most urgent deadline. When there's a 7-month timeline to complete a project, it's tempting to set it aside for other more pressing issues. Even teams with fantastic project managers struggle with this.
  5. Launching Your Baby Into The World Is Hard: Any team working on a project for 4-12 months gets attached. They start obsessing over the smallest details. At best, this obsession leads to missing some internal milestones on the way to launch. At worst, it leads to what I discussed above, an unwillingness to launch the site because it isn't 100% perfect.

Does any of this sound familiar?

Don't worry. There's a better way. This is good news since Hubspot survey data shows that 75% of businesses say their website is extremely important. Something this important deserves a process that works.

Enter Growth-Driven Design

No alt text provided for this image


Growth-Driven Design is a web design methodology built for today's technology. It incorporates in key elements of the agile methodology to continually improve a site rather than continuing down the exhausting cycle of redesign after redesign every couple years.

The goal of this process is threefold:

  1. Build A Flexible Strategic Framework To Guide Your Work: Ahead of doing any work we'll sit down and build a flexible framework, including identifying key KPIs that will drive our efforts for the course of the project.
  2. Deliver A New Site Quickly: In a growth-driven design process, we seek to get a launch pad site up and running quickly that can begin driving a return on investment and satisfy stakeholders throughout the organization. The key here is that the launch pad is exactly what it sounds like, a launch pad.
  3. Consistently Enhance The Site After Initial Launch: In the growth-driven design methodology, immediately after the launch pad site is live, we enter into a series of 6-week design sprints in which we build out additional functionality. The key here is each sprint is influenced by the performance of the site to ensure that we're improving the site based on what we're learning from users in real time.

The result of this approach is not only a continually improving site, but an ever-increasing improvement to your marketing and sales efforts.

No alt text provided for this image

Another result is that as your business inevitably changes, your site will change with it. In fact, we're big proponents of maintaining an ongoing growth-driven design retainer that allows you to consistently improve your site and never have to go through the major redesign again.

The Nuts & Bolts Of Growth Driven Design

We've already established the three main components of the growth-driven design process: strategy, launch pad, and continuous improvement. In the section below I'm going to talk through the nuts and bolts of what should be done in each phase.

Strategy

Like any effective marketing strategy, our goal with strategy during the website process is to understand the overlap between the needs of the target audience and the goals that you have as a business. Here are some of the key things we try to dig into during this process

  • An empathetic understanding of the target audience's world, including the challenges they face
  • The business goals and KPIs that will determine the success of site
  • Specific ways that the site can solve the audience's challenges and as a result achieve the KPIs
  • The wish list of features and functionality for the new site
  • The features and functionality for the launch pad site

Launch Pad

A launch pad site serves as the foundation from which all future website enhancements will be built on. Think of this as a quick website build with the goal of getting a minimal viable product out into the market. Typically a launch pad site will include a homepage, product pages, a blog, and a few other features. This basic functionality combined with a brand new design can offer the refreshed look for a client without the headache of a long-term website build. It can also be completed at a reduced cost to a typical full redesign.

Continuous Improvement Through Design Sprints

Once the launch pad site is up and running, we build out the the remaining functionality for the site through a series of 6-week design sprints. Each of these sprints is self-contained and ends with the release of new features or sections of the site. Here's our workflow for a typical sprint:

  • Review site performance against key KPIs to identify what areas of the site should be worked in the sprint
  • Choose which wish list items will help solve the challenges identified in the site performance review and determine which can be completed within the scope of the sprint
  • Content, design, and development work to build the agreed upon features and functionality
  • Testing and launch of the new features

Growth-driven design creates a sustainable and repeatable process for consistently improving your site's performance against an agreed upon set of KPIs. It also removes the delays and frustrations of the typically 4 to 12 month redesign process.

My sincere hope is that adopting this approach will help you avoid the awkward meeting I described at the beginning of this post. Good luck!