Burst On To The Scene
#pipebursting, #trenchless, #nodig

Burst On To The Scene

Andy Fallon said “We have not long added #pipebursting to our Armour, in fact it was never in the company  planning.

Due to receiving many tenders from clients, we have passed them the details of a leading company within the industry.

After several weeks later, we receive a call back from the clients saying that the company has not provided quote or not responding, I feel that I am letting down these clients by pointing them in the right direction but they are not getting a service they deserve.

Not one to let an opportunity slip away, after several discussions with the HBT team we said that if we are to undertake this techniques then it has to be undertaken correctly with the right equipment.

We decided to step in & purchase not 1, not 2 or 3  but 4 pipe bursting rigs, so we can now fully deal with all situations onsite that the client has.

HBT has purchased The Miniburst pipebursting system which has the portability & quietness which lends itself to pipe replacement in confined areas such as gardens, narrow alleys and some basements.

We have successfully used miniburst for local authorities, housing associations, insurance companies, utilities companies and the residential market.

HBT was contacted to provide a solution to a collapsed 150mm clay pipe, the issue for the client was the existing 150mm clay pipe was 3mtrs deep at the rear of the property & running underneath the garden wall to the front of the property.

The collapse pipe was 7mtrs upstream making directly outside the property.

Traditional open cut techniques where not practicable due to the depth of the embankment & the property footings


Upon a site visit HBT opted to use the pipe-burst system along with the Snap-lok pipe which is manufactured especially for theses type of schemes.

Works commenced onsite with the bursting rods being pushed through the existing 150mm line until reached the reception pit.

Bursting cone was then attached & pulled through installing the Snap-lok pipe at the same time. 

Works was completed in 2 days including mobilisation & demobilisation.

Client - “Working with Andy & the HBT team has yet again been invaluable, HBT have not been undertaking pipe bursting for long but they have the knowledge & expertise within the  company to deliver & will be force to reckoned with”

For more information please contact 0845 388 3325 to speak to the HBT team



Nick Sheehan

Estimating & Marketing Director at i-Group

7 年

Next step Expandit Andy ??

要查看或添加评论,请登录

Andy Fallon的更多文章

  • Bursting To Go Back To School

    Bursting To Go Back To School

    The client contacted HBT to provide a solution to a series of collapsed 100mm pitch fibre drain runs, the issue for the…

  • Shot in the Dark

    Shot in the Dark

    Primrose Hill #UTX - #Microtunnelling Solution (#Guidedaugerbore) HBT was called to site by J Murphy & Sons to provide…

  • Rise to the Occasion

    Rise to the Occasion

    More new clients for HB Tunnelling, we where contacted to assist with 3 number new installations as the client was…

    1 条评论
  • Thinking Outside The Box

    Thinking Outside The Box

    Very often, we get asked to deliver awkward projects that our more mainstream competitors either can’t get their heads…

    2 条评论
  • Mind The Gap

    Mind The Gap

    HB Tunnelling was contacted to assist with new installation of a 225mm diameter foul line at Penshurst Rd, London. Upon…

    3 条评论
  • HBT - On Fire

    HBT - On Fire

    Mainstream we are not! Yet another scheme that required some serious thinking outside the box. Here at HB Tunnelling…

    5 条评论
  • School's Out

    School's Out

    HBT were contacted by the client to assist with the installation of 250mtrs of 150mm foul line. As part of the…

  • Bourne to Succeed

    Bourne to Succeed

    Very often, we get asked to deliver awkward projects that our competitors either can’t get their heads around, or…

    1 条评论
  • Heading is the Quay to Success

    Heading is the Quay to Success

    HB Tunnelling were approached by the Client/Consulting Engineers to look at the best approach to connect an 450mm foul…

    1 条评论
  • Down Down, Deeper & Down

    Down Down, Deeper & Down

    Down Down, Deeper & Down Working with great clients is always a huge plus to the supply chain of the Construction…

    4 条评论

社区洞察