Building (together in) the Future          - the Post C-19 Era

Building (together in) the Future - the Post C-19 Era

March 18, 2020 - Boston (USA) announced a complete cessation of construction projects by March 23rd. It is quite plausible that other cities and/or countries around the world could follow suit and the design + construction industry will grind to a hard stop. While we all keep safe, protect our families, watch out for our workmates, support our neighbors and do our part to flatten the curve there is no doubt many wonder - once we emerge from all of this, will we just pick up where we left off? 

No - we won't. 

 An expiry date that’s well past due. 

While we are amid this unprecedented socio-economic maelstrom, we will witness the rapid descent of an ostensibly 200-year-old design & construction process into redundancy. Given the disruption on traditional supply chains, impact of a dispersed and diminished workforce, restricted financing along with the possible limitations on movement and trade, we will be faced with business models that literally become obsolete in possibly months and not years. At present, many design + construction firms are left with Remote Protocols that only include email, a smart phone and an online meeting platform. Of these, many have no ability to move their production capacity from a physical to a virtual presence. 

 Change isn’t linear, especially in a time of crisis. 

It is likely that we will now see a rapid evolution with disparate working parts/groups that speedily coalesce into a new form, exponentially leveraging pre C-19 and post C-19 emergent technologies to digitally (without drawings) design, procure, fabricate, assemble, and better operate our buildings. The approach will need to be generally right and move ahead, rather than to be prescriptively correct and go nowhere. This will greatly change the landscape - including public procurement and risk management, moving from ineffectually protecting against loss (increasing cost), to the active promotion of gain (decreasing cost). 

An outcome for all infrastructure (vertical and horizontal) is that it must result in highly predictable, accelerated and achievable timelines, completed at the least (fixed and certain) cost, return greater positive cash flows for the private sector, and reduce the spending burden for the public sector. Post C-19 we will be faced with many challenges. Like never before, time will be of the essence - approaches and processes that are highly cross-functional, disrupt every aspect from finances, the snail paced supply chain, and on into regulatory structures - will require us to be focused on employing entirely divergent ideas and essentially new business models for the infrastructure industry. 

 Timing is everything. 

How quickly we begin the change is up to us and our willingness to discard what was held dear and sacrosanct for over two centuries. Already, pre C-19 incremental innovations that attempted to salvage an ailing industry such as "Incentivized" Project Delivery (IPD) simply looks odd and out of place today when the "Big Room" is examined through the lens of social distancing and (just one example of the waste) the exorbitant cost of putting (as can be seen below) about 30 highly trained individuals in the same room at about $4,500/hr. Suddenly, we come to the realization where design + construction as we know it resembles the late 1990's dot.com collapse and like any other bubble, it has just burst.  

BIG Room with almost 30 people in close proximity at significant cost.

We can use the time we have now between the pre/post C-19 era to move quickly to reset the industry. As 80% of vertical infrastructure was $10 Million (CAD) or less in construction cost, then we begin there and eventually scale up processes to the remaining 20%. Stimulus packages that see large scale projects will not help and they will still take longer to design, procure, fabricate and assemble even with nascent processes. Smaller projects will get people working quickly and if we (initially) have a more regional approach to the supply chain we can retool redundant industries, fast.  

 Lead the charge at the dawn of a new era. 

For the present, I am reminded of how we desperately need great leaders in times of crisis – I am convinced they will emerge in your neighborhood, your cities, your provinces, countries and continents. These leaders will help us through some of the most troublesome times. They will help us see that while Humankind will be terribly shaken, it will not be defeated. Each day the sun sets and another day dawns – there is a day that will come full of promise and hope, of new and exciting things we never imagined we could accomplish. Rise up and be that leader.  

Stay safe.    

 

 

Daryn Kemp

Co-Owner at Venger Electrostatic Coatings

4 年

C19 will change us forever - and radical change - not incremental. Great insights Allan - you totally nailed it!!

回复
Curtis Friesen

Regional Director of Sales Canada (National) & the Western US

4 年

Well said and wonderful insight. Thanks for writing and sharing!

回复
Trina L.

Principal at Larsen Engineering Inc.

4 年

Allan, I hope you’re correct in this. I’d love to see efficiency in our industry be the result of this disruption!

回复

You were always ahead of your time Allan - I trust your vision of evolution emerges now more than ever as you so eloquently justify in your article. Can we all be so open to divergent ideas and business models?

要查看或添加评论,请登录

Allan Partridge的更多文章

  • Blueprints to solve Housing Crisis - are the Feds serious?

    Blueprints to solve Housing Crisis - are the Feds serious?

    Liberals to revive ‘war-time housing’ blueprints in bid to speed up builds (msn.com) With absolute incredulity I had to…

    8 条评论
  • Building (together in) the Future: The Coming Inflection Point

    Building (together in) the Future: The Coming Inflection Point

    The clear signal at the recent Calgary Real Estate Forum is that the burgeoning cost of construction continues to…

    2 条评论
  • Digital Quantities - The Sooner, The Better

    Digital Quantities - The Sooner, The Better

    I personally continue to enjoy exploring the future of making buildings around highly detailed digital and data…

    3 条评论
  • Part 2 - Building (Together in) the Future – Where should we go from here?

    Part 2 - Building (Together in) the Future – Where should we go from here?

    Intermission In our post of March 20, 2020, early in the pandemic we surmised that we would likely emerge into an…

  • The Sun will Rise Again and we will Be Better.

    The Sun will Rise Again and we will Be Better.

    As we face turbulent times I thought I would share some of my personal story that seems fitting and hopefully you will…

    28 条评论
  • Building (together in) the Future

    Building (together in) the Future

    Part 2 - Radical Common-Sense Here at ncx+ we are enjoying along with our much-appreciated industry partners a post-BIM…

    5 条评论
  • Building (in) the Future

    Building (in) the Future

    I hope you will join David LeMay (Stuart Olson), Andrew Sharman (University of Alberta) and myself as part of the…

    2 条评论
  • The End of Design & Construction and the Emergence of Making Buildings

    The End of Design & Construction and the Emergence of Making Buildings

    Part 1: A Moonshot and the Master Builder John F. Kennedy posed a literal moonshot in May 1961 saying that the USA…

    7 条评论
  • Want to be better?

    Want to be better?

    Are you passionate about making a difference for clients and projects? Do you want to be part of a team that focuses on…

  • BIM - Where am I again?

    BIM - Where am I again?

    BIM at a Crossroads – Five challenges we rapidly need to overcome. Building Information Modelling (BIM) has been around…

    13 条评论

社区洞察

其他会员也浏览了