Bromborough Head Quater's

Bromborough Head Quater's

As the business continues to grow it hasn't been easy to swallow that nine months ago I made the decision to move our head office's in to a purpose built 1200 SQ FT facility that combined offices with workshop space and a small yard. Within the first six months we had overhauled over 10MW of machines and it became apparent to me that we just did not have the space to support our service business and repairs services under this one roof.

Fast forward Twelve months and here we are, we currently have over 500MW of Prime & Standby units under contract and have a 2MW 3516 in the workshop for repair along with a 500Kva Scannia unit.. The problem being? we now have a waiting list for units to enter our facility, a further two 500's and a 1MW CAT unit that are dependent on the completion of the ongoing works alongside trying to operate service vehicles, stock and waste transfer it was slowly turning into a BIG problem.

I've done my upmost to keep us based where we currently are and regrettably invested heavily to make it work and aesthetically what i wanted, but the time has come for a change. Except this move isn't just any move, we are moving in to something much bigger, much scarier and much more of a challenging than ever before except it will allow us to continue to grow, remain strong and keep our service at its best. The new facility we will relocating to in the summer of 2020 offers 6500 SQ FT of workshop space, 1000 SQ FT of office space and 3000 SQ FT of yard space.

The new Facility will become home to the heart of our operation, with the development of the following:

  • National Remote Monitoring Station & Control Center
  • Test cell & Dyno Facilities
  • Engine Rebuild & Overhauling Facilities
  • Bespoke Build Capabilities
  • Control System Design & Build areas in clean room condition's
  • State of the art repair and refurbishment facilities

Along with all of the above we will be working towards reinforcing our 24/7 capabilities, increasing our stock levels and spares availability, its not going to be easy but we have made it this far. I look forward to the move as we continue to grow and evolve and I cant wait to share the journey with you all, if it wasn't for our relentless commitment and unrivaled levels of service from our team we wouldn't be here so here's to the future.

if you need any support with standby, prime or critical power applications please don't hesitate to get in touch with us around the clock! +44(0)800 689 480

Aidan Clegg

Director at Respond, Service & Maintain LTD

5 年

Great news. Congrats mate!

Anthony Long

Technical Director at STRATA? Protection and Skanwear

5 年

Best decision you ever made Jack! Away from toxic people

David Davenport (Mr Arc Flash) CEng. MIET. FInstLM.

Chief Electrical Engineer ESIPAC & Technical Director Transmag

5 年

Jack, your name and Pleavin Power is growing as rapid as your aspirations.. WHY??? Because you constantly deliver and over deliver and exceed each and every customer expectation I have had the pleasure to encounter. Many talk the talk... but I have also witnessed many times, you personally and your company really do walk the walk in the most difficult and most demanding and heavily penalised of sectors ... and your a really decent, upstanding, straight talking guy toboot... surrounded by a loyal and fantastic team...2020? hmmm ... should go ok eh?

Colin Bell

General Manager at RA International

5 年

Great stuff Jack...I have been monitoring your growth and drive....excellent stuff....all down to you and your ever expanding team...well done.

Paul Sheldrake

Managing Director at Electric Cable Connections Ltd

5 年

Great read, well done

要查看或添加评论,请登录

Jack P.的更多文章

  • Don't Buy Our Generators!

    Don't Buy Our Generators!

    That’s right. Don’t buy them.

    7 条评论
  • Forging The Future

    Forging The Future

    Over the weekend, our management team gathered in our new boardroom to make key decisions that will shape the rest of…

  • Do you want my phone number?

    Do you want my phone number?

    The start of 2025 has been non-stop for us at Pleavin Power and with everything we’ve got in the pipeline, it’s only…

  • Comprehensive Fuel Management in 2025

    Comprehensive Fuel Management in 2025

    At Pleavin Power, we understand that fuel management is the backbone of businesses relying on consistent energy…

    1 条评论
  • The High-Stakes Pumping Operation That Saved Shipping Schedules ?

    The High-Stakes Pumping Operation That Saved Shipping Schedules ?

    It's been a whirlwind of a start to 2025 for team Pleavin Power. I've honestly felt it was coming for the past 6 months…

  • Turning Up The Power in 2025

    Turning Up The Power in 2025

    As we step into 2025, I can’t help but feel a renewed sense of energy and ambition for what’s ahead. Last year was one…

    1 条评论
  • What On Earth Has Happened?

    What On Earth Has Happened?

    I feel like I've just blinked and 2024 has gone by in a flash. It can be a funny one in business, some months feel like…

    1 条评论
  • Did You Forget?

    Did You Forget?

    As we gear up for a new year, it’s easy to focus on growth, targets, and new strategies. But in the drive to move…

    1 条评论
  • The Road to Net Zero at Pleavin Power

    The Road to Net Zero at Pleavin Power

    At Pleavin Power, we fully support the global drive toward net zero emissions and are excited about the opportunities…

  • Power Is Taking a Serious Turn...

    Power Is Taking a Serious Turn...

    Power—it’s something most of us don’t think about until it’s gone. But as we head into winter, the reality of power…

    3 条评论

社区洞察

其他会员也浏览了