Briefing Paper: West Bengal Coal Sector Development
Subject: Current Status and Future Outlook of Coal Mining in West Bengal
Executive Summary:
West Bengal plays a crucial role in India's mineral production, with coal dominating the state's mineral output. The state holds substantial coal reserves and is actively developing new mining projects, notably the Deocha Pachami Coal Mining project, touted as India's largest. Simultaneously, the West Bengal Power Development Corporation Limited (WBPDCL) has achieved self-sufficiency in coal supply for its thermal power plants, significantly reducing reliance on Coal India Limited. While these developments signal growth and progress, challenges related to land acquisition, environmental impact, and coal transportation logistics need careful consideration.
Background:
- West Bengal is the third-largest mineral producer in India, contributing approximately one-fifth of the nation's total mineral production.
- Coal constitutes 99% of the state's extracted minerals, with West Bengal holding 11% of India's total coal reserves. Estimated reserves in 2015 were 31.43 billion tonnes.
- Key coalfields are located in Raniganj and Barjora.
- India's largest coal mine is situated in the Birbhum Coalfield, with estimated in-place reserves of 2,100 million tonnes and a potential investment of Rs. 20,000 crore (US$ 3 billion).
- The state has been allocated eight coal blocks, with six being developed through Public-Private Partnership (PPP) by the West Bengal Mineral Development & Trading Corporation Ltd. (WBMTDC) and two by the Damodar Valley Corporation (DVC).
Current Developments:
- Work has commenced on the Deocha Pachami Coal Mining project in Birbhum district, following Chief Minister Mamata Banerjee's announcement. This project is expected to significantly augment the state's coal production.
- Concerns regarding land acquisition and potential displacement of local communities have arisen around the Deocha Pachami project. The state government has offered assurances of jobs and compensation.
- WBPDCL has achieved self-sufficiency in coal supply for its thermal power plants, reducing dependence on Coal India Ltd. This has been achieved through increased production from captive mines.
- WBPDCL's coal production from captive mines reached 18.44 million tonnes in FY 2023-24, with a target of 20 million tonnes for FY 2024-25. Key contributing mines include Pachwara North, Gangaramchak, and Barjora North.
- WBPDCL supplies its entire generation to the West Bengal State Electricity Distribution Company Limited (WBSEDCL).
Challenges:
- Land Acquisition and Displacement: The Deocha Pachami project has raised concerns about land acquisition and potential displacement of villagers. Balancing development needs with community rights remains a key challenge.
- Environmental Impact: Increased coal mining activity raises concerns about environmental degradation, including air and water pollution. Sustainable mining practices and environmental mitigation measures are crucial.
- Coal Transportation Logistics: Transporting coal, particularly from the Pachwara North mine, poses logistical challenges due to the distance to loading stations and environmental concerns related to road transport. Improving transportation infrastructure and exploring alternative transport methods are necessary.
- Community Relations: Maintaining positive relationships with local communities and addressing their concerns about land, livelihoods, and environmental impact is essential for the long-term success of coal mining projects.
Key Issues for Consideration:
- The long-term energy strategy for the state, including the role of coal in the energy mix.
- Balancing economic development with environmental sustainability.
- Addressing the social impact of coal mining projects, including land acquisition, displacement, and community livelihoods.
- Developing efficient and environmentally sound coal transportation infrastructure.
- Promoting transparency and community participation in coal mining projects.
Recommendations:
- Conduct thorough environmental and social impact assessments for all new coal mining projects.
- Develop comprehensive rehabilitation and resettlement plans for displaced communities.
- Invest in sustainable mining technologies and environmental mitigation measures.
- Improve coal transportation infrastructure, potentially including rail or pipeline options.
- Foster open communication and dialogue with local communities to address their concerns.
- Develop a long-term energy plan that considers the transition to cleaner energy sources.
Conclusion:
West Bengal's coal sector is experiencing significant growth and transformation. While the state's substantial coal reserves and increasing self-sufficiency in power generation offer economic opportunities, addressing the associated challenges related to land, environment, and logistics is critical for ensuring sustainable and equitable development. A balanced approach that considers economic, social, and environmental factors will be essential for the future of coal mining in West Bengal.