**BPSI Project Highlight** Cutting-Edge Upgrades To Metal Warehouse
Dan Bechtel
Chief Executive Officer at Dependable Solutions So Cal and Deep Energy Solutions
Upgrades Installed:
? Metal Racking
? Mezzanine
? Secure Fenced In Storage Area
? Ceramic Insulation Coating
? LED Lighting With Occupancy Sensors
? Exhaust Fan To Ventilate Warehouse
Step 1. Electrical Conduit
Tapped into the electrical panel and installed conduit for the electric upgrade required for final design.
Step 2. Deep Clean
The entire warehouse was emptied and power washed from the floor to the ceiling.
Step 3. Insulation
Installed Ceramic Insulation Coating to provide insulation to make the building cooler for the inventory and more comfortable for the people working in the building. Click Here is for details of the CIC insulation process and to Watch Video.
Step 4. Shelves + Mezzanine
Installed the racking, mezzanine, and fencing. Many warehouse spaces have ample vertical space, by using mezzanines and catwalk flooring they can make use of this space by taking storage vertical.
Step 5. Lighting & Ventilation
Installed lighting to shelves, work areas and outside building. LED lighting and occupancy sensors were installed to increase the energy efficiency so the lighting is only on when it is being used. BPSI also installed an exhaust fan to ventilate the warehouse.
This was all installed to engineered plans to ensure the load capacity was met for the safety of this project.
BPSI Has Over 30 years Of Experience With Upgrades Involving Multiple Projects and Trades
If You Have An Upcoming Project
Email or Call Us Now
Find Our More: https://bpsi.me/projects/139-metal-warehouse-upgrades
Other BPSI Services: https://bpsi.me/services
Other BPSI Completed Projects: https://bpsi.me/projects