BOE : BASIS OF ESTIMATE

BOE : BASIS OF ESTIMATE

The BOE clearly define the design basis, planning basis, cost basis, and risk basis of the estimate .

1-Design Basis: The overall scope of the project should be summarized, with additional detail provided for each

2-Planning Basis: BOE should document information from the integrated project plan

3- Cost Basis: The source of all pricing used in the estimate should be documented in this section of the BOE. This would include the source of all bulk material pricing, the pricing of major equipment

4- Risk Basis: Since, by definition, every estimate is a prediction of probable costs, it is clear that every estimate involves uncertainty and risk

Emad Ramadan.?? BSc,PMP?,PMOCP?,MBA,CEM?,FIDIC-CLAC,LEED?,OSHA?.

Projects Director - Senior Project Manager. | Manging Mega Projects -Starting from PreContract Negotiations stage till final Takeover and Closeout stage- is the field of my Experiences and Achievements.

1 个月

Very useful, appreciate your efforts and sharing. Hope you all the best.

回复

要查看或添加评论,请登录

Mohamed Shams的更多文章

  • OBS , ORGANIZATION BREAK DOWN STRUCTURE

    OBS , ORGANIZATION BREAK DOWN STRUCTURE

    reflects the company’s organization as integrated with a particular PMO to support a specific project. Functional…

  • COST ESTIMATE

    COST ESTIMATE

    Cost estimating is the iterative predictive process used to quantify , cost , and price the resources required by a…

  • asset Management

    asset Management

    The lifecycle of a strategic asset can be summarized by the following five (5) stages: 1- Ideation – Determine an…

  • RISK RESPONCES

    RISK RESPONCES

    for threats : 1-Avoid: Involves eliminating either the probability or impact. This can be done by either clarifying…

  • Important Terms In Cost Management

    Important Terms In Cost Management

    Common language terms and their symbols for time value of money problems are : P = present value F = future value A =…

  • Why Construction Projects Failed ???

    Why Construction Projects Failed ???

    According To AACE Practice : 1-Failure of the project team to understand and fully comprehend the scope of the project…

    1 条评论
  • SUCCESS INDEX (SI)

    SUCCESS INDEX (SI)

    SUCCESS INDEX (SI) Numerical evaluation of total organizational performance is possible using the Success Index(SI). It…

  • Toxic Conflict between project manager and cost engineer

    Toxic Conflict between project manager and cost engineer

    Conflict between these roles can reach Project Failure . .

  • VALUE ENGINEERING

    VALUE ENGINEERING

    Steps: 1- An organized creative approach to cost reduction. 2- Targets function versus technique.

  • Conceptual Estimating

    Conceptual Estimating

    Conceptual estimating methods are typically used for Class 5 and Class 4 (and sometimes for Class 3) estimates. these…

社区洞察

其他会员也浏览了