If it turns out that in any Fluid Catalytic Cracking (FCC) if the air blower is the constraint, then the low cost improvements could be:

  • Check whether inlet air dampers, if present, are fully open when the controller output is 100 %; unbolting the actuator could buy a little more damper opening.
  • Check inlet filter for clean condition.
  • Check whether filter and damper could be changed out for lower DP.
  • Check outlet line, check valves for excessive DP.
  • Check whether re-generator pressure can be lowered
  • Check whether lower DP slide valve is available
  • Some have done oxygen enrichment

Then check whether blower rotating assembly can be changed or speed can be changed; before changing the blower itself.

There is one more possibility! Can you guess?

Rahul Deshpande

Process Engineering / Commissioning / Technical Service / HSE department

4 年

The process licensor shall be consulted to determine reasonably accurate power (kWh per bbl feed) requirements.