1. Project Description

This project aims to identify?novel technologies for the conversion of agro-residue and waste into?Renewable Natural Gas (RNG) plant and Bio-CNG?and evaluate technology vendors utilizing a modular, plug-and-play digester model.?The biogas is further purified to meet the standard IS 16087:2016, and compressed and stored under high pressure in cylinder cascades for use in transportation and industrial applications.

The plant will prioritize:

  • Feedstock Flexibility: Ability to handle a variety of organic materials (starch and cellulosic) from agricultural, and farm waste products like Napier Grass, Bagasse, Rice Straw, Maize Straw, Wheat Straw, and Soybean Thrash for optimal yield.?
  • Minimal Pre-treatment: Technologies that eliminate complex pre-treatment steps like enzymatic hydrolysis.
  • Cost-Effectiveness: Focus on balancing capital and operational costs for a viable RNG production facility.
  • Continuous Stirred Tank Reactor (CSTR) technology is used in biogas plants to process manure and dung. CSTRs are closed tanks that contain a continuously agitated and mixed content. The CSTR process involves charging organic substrates into primary digesters through a buffer tank or solid feeder, then feeding the primary digester with fresh substrates. The mixing inside the primary digester is optimized, and microorganisms are introduced and maintained at optimal conditions. This allows for efficient biogas production. The biogas can then be used to produce electric and thermal energy, or purified to separate CO2 from bio-methane for chemical and alimentary industries
  • The purity specifications for biogas (biomethane) as per IS 16087:2016 (Reaffirmed Year: 2020) outline the quality standards that biogas must meet to ensure its suitability for various applications. Below are the key purity specifications typically included in this standard: Methane Content: The methane content in biogas should typically be within a specified range to ensure its energy value and suitability for use as a renewable fuel. This range may vary depending on the intended application of the biogas.Impurities Content: The standard may specify maximum allowable levels of various impurities such as carbon dioxide (CO2), hydrogen sulfide (H2S), moisture content, and other trace contaminants. These impurities can affect the performance of biogas equipment and may need to be minimized to meet quality requirements.Odorization: Depending on the application, biogas may need to be odorized to provide a warning smell in case of leaks. The standard may specify requirements for the addition of odorants and the intensity of odorization.Pressure and Temperature: Specifications may include requirements for the pressure and temperature of the biogas at the point of delivery to ensure consistency and compatibility with downstream equipment and distribution systems.Particle Content: The standard may also address the presence of particulate matter or solid contaminants in the biogas, which can cause fouling or damage to equipment and may need to be filtered or removed.Safety Requirements: In addition to purity specifications, safety requirements such as explosion limits, flammability, and toxicity may also be addressed to ensure the safe handling and use of biogas.
  • These purity specifications are designed to ensure the quality, safety, and performance of biogas for its intended applications, including power generation, heating, transportation, and industrial processes. Compliance with these standards is essential for the widespread adoption and acceptance of biogas as a renewable energy source.

2. Project Objectives

  • Evaluate and identify technology vendors offering modular, plug and play digester models suitable for large-scale RNG (Renewable Natural Gas) plants in India.
  • Assess the maturity level of technologies for? Renewable Natural Gas (RNG) and Bio-CNG production, with a focus on eliminating complex pre-treatment methods and enhancing feedstock flexibility.
  • Determine the capital and operational costs associated with setting up co-digestion and agro waste-based RNG plants.
  • Analyze the area requirements and minimum scale of operation for optimal plant efficiency. Investigate avenues to increase RNG yield through novel purification technologies, innovative microbes, and mixed feedstock utilization.
  • Identify a minimum of 3 qualified technology vendors offering modular, plug-and-play digester systems suitable for a 100 TPD (Tonnes Per Day) RNG plant.
  • Evaluate and compare vendor solutions based on:Technical specifications (feedstock compatibility, pre-treatment requirements, RNG yield)Capital cost estimates (considering co-digestion and agro waste-based options)Operational cost estimates (including power consumption, manpower needs)Area requirement estimations for plant setup and feedstock storage
  • Recommend the most suitable technology vendor considering all evaluation criteria.

3. Project Deliverables

  • Detailed assessment report of technology vendors offering modular, plug and play digester models.
  • Analysis of pre-treatment methods and their impact on RNG production suitability.
  • Cost analysis report outlining capital and operational costs for co-digestion and agro waste-based RNG plants.
  • Evaluation of area requirements and minimum scale of operation for efficient plant setup.
  • Exploration report on avenues to increase RNG yield through novel purification technologies, innovative microbes, and mixed feedstock utilization.
  • A shortlist of qualified technology vendors with detailed profiles.
  • A comparative analysis of vendor solutions based on the evaluation criteria.
  • A recommendation report outlining the most suitable technology vendor with justification.

4. Project Scope

  • The project will focus on evaluating technology vendors offering modular, plug and play digester models suitable for large-scale RNG plants.
  • Assessment of pre-treatment methods, capital and operational costs, area requirements, and minimum scale of operation will be within the scope.
  • Exploration of novel purification technologies, innovative microbes, and mixed feedstock utilization to increase RNG yield will also be included.
  • This project focuses on technology vendor identification and evaluation.
  • Design, engineering, and construction of the RNG plant are excluded.
  • Selection of specific feedstock will be determined following vendor selection.

5. Project Stakeholders and?Project Team??

  • Project Sponsor: (Name of the decision-maker for the RNG plant project)
  • Project Manager: (Name of the individual leading the vendor identification process)
  • Technical Evaluation Committee: Team responsible for assessing vendor technical specifications
  • Financial Evaluation Committee: Team responsible for analyzing vendor cost estimates
  • Project Manager: Responsible for overall project coordination, communication with stakeholders, and ensuring timely delivery of project objectives.
  • Technology Analysts: Tasked with evaluating technology vendors and assessing the maturity level of bio-CNG production technologies.
  • Financial Analysts: Responsible for analyzing capital and operational costs associated with RNG plant setup.
  • Engineering Experts: Provide technical insights into plant area requirements, minimum scale of operation, and potential avenues for increasing RNG yield.
  • Microbiologist Consultant: Offers expertise in microbial technologies and their impact on RNG production.

6. Project Timeline

  • The estimated timeline for this project is (insert timeframe, e.g., 8 weeks).
  • Start Date: [Insert Start Date]
  • End Date: [Insert End Date]

7. Project Budget

  • Total land required for a 100-150 TPD plant is 4-5 acres.?
  • Minimum scale of operation:? The technology is feasible at minimal scales of 20 TPD? For better return on investment, the minimum scale of the plant should be in the range of 15-25 TPD.
  • These plants could be arranged in modules for 5-12-15 TPD bio-CNG plants.
  • The estimated budget for this project is (insert amount).
  • Total Project Budget: [Insert Total Budget]

8. Approval Required

This project charter requires approval from the Project Sponsor before proceeding.

9.?In-Depth Analysis of Risks and Mitigation Strategies/Assumptions:**

  • Risk: Technology vendors may not meet the required standards or scalability for large-scale RNG plants.**
  • ? ?- Mitigation: Conducting thorough vendor evaluations and feasibility studies is crucial in mitigating this risk. By evaluating vendors based on their track record, technological capabilities, scalability, and compatibility with project requirements, the project team can ensure the selection of vendors who can deliver on the project's objectives. Additionally, engaging in extensive testing and piloting of vendor technologies can provide further assurance of their suitability for large-scale RNG plant implementation.
  • Risk: Capital and operational costs may exceed budget estimates.**
  • ? ?- Mitigation: Regular monitoring of costs throughout the project lifecycle is essential to identify any deviations from budget estimates. By implementing robust cost control mechanisms and tracking expenses against budget allocations, the project team can proactively address cost overruns. Moreover, exploring cost-saving measures such as optimizing resource utilization, negotiating favorable contracts with suppliers, and leveraging economies of scale can help mitigate the risk of exceeding budget estimates without compromising project objectives.
  • Risk: Regulatory hurdles or environmental concerns may delay project implementation.**
  • ? ?- Mitigation: Staying updated on regulatory requirements and actively engaging with relevant authorities are essential mitigation strategies for addressing this risk. By proactively identifying and addressing regulatory hurdles and environmental concerns, the project team can minimize the likelihood of delays in project implementation. This may involve conducting thorough environmental impact assessments, obtaining necessary permits and approvals, and collaborating with regulatory bodies to ensure compliance with applicable laws and regulations.
  • Risk: Availability of qualified technology vendors meeting all project requirements.**
  • ? ?- Mitigation: To mitigate this risk, the project team can adopt a proactive approach by expanding the vendor selection process to include a broader pool of potential vendors. This may involve conducting market research, attending industry conferences, and soliciting recommendations from industry experts to identify additional qualified vendors. Additionally, establishing clear and comprehensive selection criteria and conducting thorough due diligence on potential vendors can help ensure that qualified vendors meeting all project requirements are identified and engaged.
  • Risk: Accuracy of vendor information and cost estimates provided.**
  • ? ?- Mitigation: To mitigate this risk, the project team can implement rigorous validation processes to verify the accuracy of vendor information and cost estimates. This may involve conducting independent assessments, seeking references from previous clients, and scrutinizing vendor proposals in detail to ensure alignment with project requirements. Additionally, incorporating contingency provisions into contracts and agreements can provide a buffer against potential inaccuracies or discrepancies in vendor information and cost estimates.
  • Risk: Market fluctuations in capital equipment and operational costs.**
  • ? ?- Mitigation: To mitigate the impact of market fluctuations, the project team can adopt a proactive approach by closely monitoring market trends and forecasting potential changes in capital equipment and operational costs. By staying informed about market dynamics and leveraging long-term contracts or hedging strategies where feasible, the project team can mitigate the risk of cost escalation due to market fluctuations. Additionally, maintaining flexibility in project planning and budgeting to accommodate potential changes in costs can help mitigate the impact of market uncertainties on project outcomes.

By addressing these risks through comprehensive mitigation strategies, the project can enhance its resilience to potential challenges and uncertainties, thereby increasing the likelihood of successful implementation and achievement of project objectives.