BIM Level 4 of Maturity in AECO is Metaverse

BIM Level 4 of Maturity in AECO is Metaverse

A DECLARATION OF A NEW LEVEL OF MATURITY FOR AECO SECTOR, AND IT IS NOT BIM

In 2011 the Government Construction Strategy of the United Kingdom mandated the use of Level 2 Building Information Modeling (BIM) on all public sector projects by 2016. This bold decision led to the government and the construction industry working together to develop the industry’s skills, standards and tools to dramatically reduce the cost of social infrastructure. In 2019, a graphic created by Jacek Katzer talking about BIM levels has been publicated, and soon a new version will be adopted globally to represent BIM maturity Levels, including a futuristic Level 3.

We today want to propose a new graphic version, redefining Level 3 in where we are inmersed, and creating a new Level 4 to come in the future, but being shaped fast by main technological companies, Metaverse will impact in AECO for sure, and it is Level 4 of maturity.

BIM Maturity Levels - Today

No alt text provided for this image

The UK Code for BIM defined the maturity levels as shown in image above. It can be concluded that the levels start from no collaborative environment (level 0) to an open collaboration level. It reflected the future improvement in collaborative tools, which would be affected by the construction sector. Moreover,?new levels of BIM maturity were expected to continue updating in the future. (we are proposing the Level 4)

  • Level 0:?This is?the primary?level which?includes 2D?CAD (Computer Aided?Design tools)?for drafting?and its?output is?simply distributed?along the?parties via paper?or electronic prints. In this stage, there is no combination of any BIM enabling software.
  • ?Level 1:?This is a combination of 3D CAD models and 2D drafting documents with information about the product. This?represents?the current?level for?most organizations?that are involved in?the construction?The collaboration?is increased within?the internal departments?of the?organization?itself and?3D CAD?models are?more?common. The attachment of data representing different sides of the project with lower model and 2D drawings are mostly used for documentation of work and production of shop drawings.
  • ?Level 2:?This is a level which operated by collaborative practices. Each participant in this level is working on his own 3D model. It?comprises the sharing of data through common file formats like Industry Foundation?Classes (IFC)?and Construction?Operations Building Information Exchange (COBie). Therefore, each party is entitled to use any type of BIM software?on?the?condition?that it?is?interoperable?with?the?formats?agreed?upon for information exchange purpose.
  • ?Level 3:?This level uses a full collaborative process with a single shared model. It represents the future of collaboration among different construction stakeholders and throughout all the construction processes and?This?allows all?parties to access?the project. Paperless project based on?the?‘cloud-based’ data will?be extended to the execution of the project where rugged tabs replace the conventional shop drawings. This allows the risks to be reduced by reducing the conflict of information.

More than BIM for our sector, crossing with others

No alt text provided for this image

But for us,?Level 3?is much more than a cloud based collaboration in a fully integrated environment, it is about a new paradigm appearing called?DIGITALTWIN?(see our conceptualization of this technology in this POST)

So for us Level 3 is not only BIM in a better maturity level, it is related to BIM integrated to other ICT technologies based in Data, Cloud Computing, Simulations, Advanced Analytics, all intented to improve Asset Management in a Lifecycle approach for first time.

IoT technology is getting mature and real time data is helping to obtain better results than MEP or Structural Calculations, so Simulations can be calibrated, improved in order to obtain more accurated results and being able to anticipate to the problems if we create comparison between real time data and expected results.

Digital models, BIM models but also 3D or GIS are helping us today to contextualize the data and to be able to provide and added value to ICT technologies that are growing fasts and being incorporated by more and more companies and organizations.

So we need to create new ecosystems in AECO that take the best of Level 2 to interact to Data Science, a Cyberphysical environment in where sensors, machines, systems and software are linked, thanks to edge and cloud computing, and this much more than a CDE, so CDE was not intented to support BigData, in that case a part of the information is managed in DataLakes or Data Warehouses and CDE is structuring the General Asset Information to be able to create new relationships with non BIM data sources.

The more important is the usability of DigitalTwins, this technology is really intended to improve Asset indicators, like Energy, Sustainability, Cost Management and others.

Note that Level 3 is a big opportunity to obtain return of investment for BIM projects, using digitalmodels more than to deliver projects for construction, we are evolving to find new business models for new opportunities to grow in the sector and crossing with others, and this is just the beginning…

But a More Big one is coming,?Level 4?is Metaverse, in the upcoming years we will see how the web is going to change to a new way to understand human relationships for all sectors, fast and in a very impressive way.

AECO sector (and others) will be overtaken by a technological wave and current roles will be impacted, negatively if not ready to completely change the way we implement technologies in our profession. Artificial Intelligence is here and Architects and other designers will need to use tools that will provide 2D / 3D / Technical documents in some minutes for complex projects and project creativity will not remain in a individual author or architect, all, from the beginning, including final users if need will take part.

We have a hope for Level 4, to achieve Net Zero Energy Buildings, to implement massively new renewable energy sources and find the control for Climate Change. Also, Sustainable Development Goals will be incorporated for all sectors and will have a great impact if we find the way to socialize and get involved to all society.

Buildings like time ago with automotive and industrial sector, will be constructed by robots and prefabrication will grow to facilitate millions of persons the access to better living spaces, more efficient and sustainable.

Level 4?should be in AECO the level of no file format needed, no dimensions, just goals and ways to get them, interacting constantly with digitaltwins and their simulations, calculating future scenarios and taking the best possible decisions. We will get fun and work in a very different way, so working with technologies will be much easy and inclusive, and funny ! work will be similar to games today, with missions to achieve in a healthy competition with others, all registered and secured thanks to blockchain, being paid on time so all tasks will be registered and approved automatically.

Architects and Engineers will work to citizens, each person will have an avatar full of real time data, private and public, clinical data will be sent to health system in something seems to be wrong in the future.

Level 4 is not about BIM only,?too much things will appear and professional sectors will not be separated, like a new quattrocento.

We are being very positive, maybe too much, for this new conceptualization of what a new Level 4 could be, but it is completely in our hands to arrive to such scenario.
Fernando Morales Tosar

Arquitecto | BIM & DigitalTwin Innovation Manager | CEO POWERBIM - BIG Data Analytics para edificios, infraestructuras y ciudades mas inteligentes y sostenibles.

8 个月

Para publico hispanohablante... anunciamos webinar sobre el nuestro denominado NIVEL 4: METAVERSO - Presentamos 5 proyectos / casos de exito para corporaciones pioneras en una vision compartida: No te lo pierdas y apuntate. 24 de octubre 2024: https://events.teams.microsoft.com/event/fffc2c8a-bfa7-40a9-8f8e-9fb76ddb22b8@c0658301-8e17-4880-bda3-9b7ac70ccb2b

  • 该图片无替代文字
回复
Peter Cholakis

Improve facilities repair, renovation, maintenance, and new build outcomes and reduce costs

2 年

Planning, procurement, and project delivery process changes are the key to measurable improvement. Of course, owner leadership, commitment, and competency are required...and therein lies the core problem.

  • 该图片无替代文字
回复

要查看或添加评论,请登录

Fernando Morales Tosar的更多文章

  • MADUREZ DE LOS GEMELOS DIGITALES PARA EDIFICIOS, INFRAESTRUCTURAS Y CIUDAD

    MADUREZ DE LOS GEMELOS DIGITALES PARA EDIFICIOS, INFRAESTRUCTURAS Y CIUDAD

    El grafico planteado más abajo, quiere explorar el nivel de madurez tecnológico del desarrollo de gemelos digitales, de…

  • BIM DigitalTwin for Smart Buildings and Cities

    BIM DigitalTwin for Smart Buildings and Cities

    In this article we want to help with the correct definition of what a digital twin is from an evolutionary point of…

    2 条评论
  • The W W W A L L R O O M

    The W W W A L L R O O M

    De como un dise?o no construido tiene vida y evoluciona en la mente de su creador No se si es bonito o feo, es algo que…

  • POWERBIM

    POWERBIM

    POWERBIM is a web-cloud application created to manage BIM models and their components with databases. With POWERBIM we…

  • BIM Data Management para proyectos hospitalarios

    BIM Data Management para proyectos hospitalarios

    Este artículo resume y expande la aportación de Fernando Morales en la exposición que se hizo en el BIM Summit 2017…

    2 条评论
  • Qué es un entorno común colaborativo BIM (Common Data Environment)

    Qué es un entorno común colaborativo BIM (Common Data Environment)

    Desde el origen de la concepción de las primeras intenciones del proyecto hasta el final de su ciclo de vida, el…

    1 条评论

社区洞察

其他会员也浏览了