Best practices for Deploying Office 365
Tamim Anwar
IT Solutions Architect | IT Manager | Cloud & Infrastructure Expert | Azure, AWS, Google Cloud Certified Engineer available to start immediately
Creating a deployment plan is a key component when migrating to Office 365 ProPlus. Planning is based on discovered assessment items, including constraints and how to implement Office 365 ProPlus to meet the goals of the project.
The following items should be considered when creating an Office 365 ProPlus deployment plan.
Source locations
When planning for the Office source locations, it is recommended for the customer to use the existing tools and processes. Office 365 ProPlus can be deployed and updated directly from the Office Content Delivery Network (CDN), System Center Configuration Manager, or an internal share such as a network share or Distributed File System (DFS).
For more information on deployment source locations, see Preferred Practices - Deployment overview.
Channel membership
To establish a build validation process within the organization, Microsoft recommends the following channel membership guidance:
· 1% get Monthly Channel
· 10% get Semi-Annual Channel (Targeted)
· 89% get Semi-Annual Channel
For specific guidance on channel membership and management, see Preferred Practices - Managing channels and updates.
Base client packaging
Because Office 365 ProPlus is a customizable package, you should determine what application sets each business group should get. Applications that are initially excluded can be added back in later; specific applications can be removed after Office 365 ProPlus has already been installed. If an application isto be excluded from the Office 365 ProPlus deployment, you should create a plan to restore or replace the application.
Architecture
Planning should be completed to identify the deployment scenarios and use cases for the 64-bit architecture version of Office 365 ProPlus. The deployment plan should include how existing Office 64-bit users will be transitioned to the new Office 365 ProPlus client.
Deployment configurations
Appropriate planning must be done to create all of the required install XMLs for the various end user deployment scenarios in the organization. The install XMLs should also include the option to install individually supported language packs for users who need a language that was not part of the original Office 365 ProPlus installation.
Shared computing
Because Office 365 ProPlus has a specific Shared Computer Activation mode, the deployment plan should include how shared workstations and VDI environments will receive the correct installation package, as well as how they will be managed.
Side by side
While Office 365 ProPlus supports generally an N-1 coexistence scenario with previous versions of Office, careful consideration and planning must be completed for any side by side scenarios. If Office side by side is going to be used in the environment, the deployment plan should contain an estimated time line of when users will transition off of the legacy Office applications and rely solely on Office 365 ProPlus. Although Office side by side is generally supported by Microsoft, it is not recommend as a long term solution for end users.
For more information on coexistence planning for side by side, InfoPath, and Project and Visio deployments.
Infopath
Because InfoPath is no longer part of the Office 2016 suite, a separate standalone installation of InfoPath 2013 must be configured and deployed. InfoPath will no longer be a part of the Office suite moving forward; plan accordingly.
Project and Visio
There are multiple versions of Project and Visio that are supported to run alongside with Office 365 ProPlus. Customers can leverage their existing Project and Visio MSI versions, or leverage the Click-to-Run (C2R) versions that support traditional volume licensing and Office 365 licensing models. The deployment plan should also include how users will request a Project or Visio install, and whether or not the process will be automated.
Office Scrub Tool (OffScrub)
You should use OffScrub to remove the legacy versions of Office prior to installing Office 365 ProPlus, including the 2013 version of Office 365 ProPlus. The deployment plan should include how the OffScrub tool will be used and integrated into the task sequence or deployment script.
Office 2016 for Mac
When planning for Office 2016 for Mac, existing Mac distribution methods and solutions should be considered.
Licensing
When planning an Office 365 ProPlus deployment, careful considerations and planning should be done to ensure all users are assigned the appropriate Office 365 license that includes Office 365 ProPlus prior to the deployment.
Network
Office 365 ProPlus requires the following ports and protocols to be open: Office 365 URLs and IP address ranges.
It requires a reliable connection to the Office CDN during both the deployment and management phases. Therefore, adequate planning should make sure that the network can support the deployment and management methodologies.