HOW TO AVOID TEARS ON THE LINER, COMPROMISING THE WATER TIGHTNESS OF THE PIPE
Mauricio Facchinetti
Owner & CEO at TOPFIBRA doo - Effective Filament Winding Pioneers
The most regular occurrence of pipe damages is seen during the cutting of a pipe, in the final rotation cycle. The difference in relative rotation during the cutting, between the pipe that is being produced and the pipe that will be discharged after the cutting, if not handled correctly, will cause a tear on the liner, compromising the water tightness of the pipe, and a possible breakage of the cutting blade.
The repair to be carried out on the liner in this case would be a very delicate operation and would in any case prejudice the aesthetics and increase the risk of rejection by the end-user.
Of course, with an increase in the diameter of the pipe, this relative velocity problem will increase exponentially, thereby increasing the risk and severity of liner tears.
I am sure that you did notice such problem in your CW machine especially if you are using the simplest and less effective accelerator model found on the market: the pneumatic accelerator.
The pneumatic accelerator has the following disadvantages:
How we did solve it?
To avoid the problems mentioned above we upgraded it and designed the E-AD 3000 ACCELERATOR replacing the old pneumatic motor with an electrical motor implementing:
Due to the success of our E-AD3000, we decided to design a new generation accelerator.
You are probably asking yourself what could TOPFIBRA have further improved on the previous version of the E-AD3000?!
领英推荐
Let’s review the improvements together.
To summarize, it is possible to install this accelerator even on an?EFW??400-4000 winder!
Fem calculation of the latest generation HIGH PERFORMANCE E-AD4000 ACCELERATOR
To avoid any unexpected variables during heavy duty working loads, we have performed a fem calculation of the underplate and slider.
We have changed the radius as indicated in the picture reducing the max stress by about 120 N/mm2.
CONCLUSION
Using the latest generation E-AD4000 HIGH PERFORMANCE ACCELERATOR, production will benefit from:
Implement NOW the NEW E-AD4000 HIGH PERFORMANCE ACCELERATOR in your CFW machine. Click on the link below to discuss your next upgrade with us:
To get more information click here.
former spool maker, laminator and material control at gulf eternit Co. Ltd (FPI dubai) maintenance supervisor at acwa pipe dammam.
3 年Which lifting table is this located sir?