Attention Stormwater Permit Holders in TEXAS!!

No alt text provided for this image

Attention Stormwater Permit Holders in TEXAS!!

TCEQ investigates TPDES MSGP Stormwater Permit holder's facility (unannounced) typically when there is a complaint filed. TCEQ investigator will look for following things:

SWP3 Review

- Quarterly inspection logs (separate log for each sector at a multiple sector facility)

- BMP maintenance log (get credit for what you do!!)

- Quarterly Visual Monitoring (QVM)

- Rain gauge data

- Site map

- BMP location/type

- Topography/flow of stormwater

- Spill kit(s) location

- Maintenance area

- Fueling area

SWP3 signature/certification

- Narrative description of BMPs

- Discharge Monitoring Reports (DMRs)

- Hazardous metals annual sampling or waiver (“TCEQ Hazardous Metals Waiver”)

- PPT member identification

- PPT benchmark exceedance inspection reports

- Inventory of materials; narrative description of sector specific activity

- Annual comprehensive site evaluation

- Annual employee training

Site evaluation

- Are adequate BMPs installed/implemented?

- Are BMPs in effective operating condition?

- Do inspection reports indicate site conditions?

- Housekeeping

- Secondary containment encompassing PSTs?

- Spills on-site?

- Trash/debris?

- Batteries exposed to stormwater?

- Exit Interview (Verbal or written)

RSB has conducted Stormwater Compliance projects in Houston, throughout Texas and nationwide.

Please feel free to call us at 1-877-727-7412 or email at [email protected] to get a site specific price for your property.

要查看或添加评论,请登录

社区洞察

其他会员也浏览了