APT Global Marine & Offshore Engineering (APT), UAE proudly announces the successful fabrication and delivery of two number Pre-Piling template

APT Global Marine & Offshore Engineering (APT), UAE proudly announces the successful fabrication and delivery of two number Pre-Piling template

APT Global Marine & Offshore Engineering (APT), UAE proudly announces the successful fabrication and delivery of two number Pre-Piling template for their prestigious client-DEME Offshore. This milestone underscores our commitment to delivering cutting-edge products that meet the evolving needs of our clients.

Offshore substation foundations and offshore wind turbines installation in its initial stage will need to have the pin piles installed on the seabed. This execution will be performed using the self-levelling piling template which will be deployed overboard from an installation?vessel into its designated location at the seabed. The piling template shall serve the following purposes:

- Allow stabbing of pin-piles and further driving in to designed depths.

- Allow for interface with drilling equipment.

1st unit Four-legged template

Overall dimension: L43.81m x W35.81m x H40.26m

Total Weight: 697T

Material Grades: NVE36

2nd unit Four-legged template

Overall dimension: L26.76m x W27.55m x H13.78m

Total Weight: 430T

Material Grades: NVE36

Class: DNV

The fabrication and delivery of the Pre-Piling templates involve a meticulous process to guarantee its quality, tolerance level and functionality requirements. By adhering to industry standard and project specifications, APT ensured timely delivery by following efficient and precise planning. This achievement is a testament to the dedication and expertise of our talented project team.

The ON TIME delivery of the templates marks a significant enhancement to the operational capability of our client, empowering them to meet the demanding requirements of piling operations for two large Offshore Windfarm installations. We extend our sincere gratitude to DEME Offshore for showing belief in APT.

We have delivered this project with the same passion and determination that have fuelled our achievements in the past. It’s really a proud moment to deliver a project safely, on time and matching the best quality standards. Anil Abraham, CEO, APT Global has noted.

"DEME is very pleased by the successful fabrication of two pre-piling templates for our offshore T&I project, the templates have been fabricated as per our quality requirements, delivered on time within a very tight?schedule! This is?a major milestone for our DEME, and we look forward to continue our collaboration and achieving future success together." DEME?Project Department has commented.

As we continue with our efforts to innovate and modernise, meeting the high expectations of our clients, this accomplishment reinforces our position as a trusted provider of High Quality solutions in the Wind farm construction/installation industry.

Shake Spares

/4.3K+Friends/Kor/Chi/Jap Item Source Developer @ +82-10-7589-2258 Whatsapp!

5 个月

Spectacular

回复
Alasdair Kennedy

Regional Manager, Middle East

5 个月

Awesome Anil and top class team

要查看或添加评论,请登录

APT Global Marine & Offshore Engineering的更多文章

社区洞察

其他会员也浏览了