AP-BRIDGE will build the deck of the Viaducto de Arrazola-25 spans of 66 m
VIADUCTO DEL TAJO - AP BRIDGE Movable Scaffolding Systems

AP-BRIDGE will build the deck of the Viaducto de Arrazola-25 spans of 66 m

The Portuguese Company AP – Bridge Construction Systems has signed the contract for building the Viaduct of Arrazola deck, which is the High-Speed Train (HST) viaduct with larger spans ever built with this construction method in Spain and Western Europe.

? This Viaduct is 1755 m long, with 25 spans of 66 m and 2 end spans of 52.5 m.

?It is the largest multi-span bridge with 66 m span for HST viaducts ever done in Spain with this technology.

???????????This Viaduct is the longest one of the sector Atxonde-Abadi?o of the Spanish High-Speed Train (AVE), that will be built by the UTE Atxonde-Abadi?o - Dragados – Tecsa.

The final design of the Viaduct is being done by FHECOR Inginieros Consultores.

Elthundrick Ohene Kymani

CHAIRMAN & CEO - DRICKKYMANI DRILLS

2 年

Good day Antonio, will you be interested in a bridge construction project in West Africa?

回复
Leonor Fechas

Diretora Executiva na Casa Pia Lisboa

2 年

Fantástico! Parabéns!

Mais uma interven??o relevante. Parabéns

Carlos Caxias

International Sales Manager at ANP-Systems GmbH

2 年

Parabéns António!

要查看或添加评论,请登录

Antonio Albuquerque Póvoas的更多文章

社区洞察

其他会员也浏览了