AP-BRIDGE will build the deck of the Viaducto de Arrazola-25 spans of 66 m
Antonio Albuquerque Póvoas
Owner - CEO | AP-Bridge Construction Systems - Portugal, Lda.
The Portuguese Company AP – Bridge Construction Systems has signed the contract for building the Viaduct of Arrazola deck, which is the High-Speed Train (HST) viaduct with larger spans ever built with this construction method in Spain and Western Europe.
? This Viaduct is 1755 m long, with 25 spans of 66 m and 2 end spans of 52.5 m.
?It is the largest multi-span bridge with 66 m span for HST viaducts ever done in Spain with this technology.
???????????This Viaduct is the longest one of the sector Atxonde-Abadi?o of the Spanish High-Speed Train (AVE), that will be built by the UTE Atxonde-Abadi?o - Dragados – Tecsa.
The final design of the Viaduct is being done by FHECOR Inginieros Consultores.
CHAIRMAN & CEO - DRICKKYMANI DRILLS
2 年Good day Antonio, will you be interested in a bridge construction project in West Africa?
Diretora Executiva na Casa Pia Lisboa
2 年Fantástico! Parabéns!
Mais uma interven??o relevante. Parabéns
International Sales Manager at ANP-Systems GmbH
2 年Parabéns António!