ALUMINIUM FORMWORK or  STEEL FORMWORK. Which is more suitable for civil buildings?

ALUMINIUM FORMWORK or STEEL FORMWORK. Which is more suitable for civil buildings?

Form our STEEL FORMWORK for the 2.39km length BATANG SARIBAS BRIDGE in MALAYSIA, to the ALUMINIUM FORMWORK for 148m high CBD upon a High-speed railway station?in HongKong thousand miles away.

从我们2.39公里长的马来西亚萨里巴斯大桥钢模板项目到数千公里外的148米香港高铁上盖铝模板项目

The different advantages between aluminium formwork and steel formwork are obvious in our eyes.

铝模板和钢模板的优势跃然纸上


Aluminium formwork can be reused about 150 to 300 times and takes 4 to 6 days on each typical floor,

铝模板能重复使用150到300次,4到6天每个标准层

With the construction of new technology, high efficiency, high quality demand upgrade, coupled with the pressure?of sustainable development of environmental protection and the increase of labor costs, people turned their?eyes to aluminium alloy formwork.

随着建筑业施工新技术、高效率、高质量需求的升级,加之环保可持续发展的压力及人工成本的增加,人们把眼光投向了铝合金模板。

Steel formwork can be reused about 30 to 40 times with harder strength and takes 8 to 10 days on each typical floor. The cost of crane to lift it can’t be neglected rather than using labor-carrying aluminium formwork. However infrastructure projects still almost use steel formwork due to its strength and fruitful budget of the project itself.钢模板可重复使用约30至40次,强度更高,每标准层层需要8至10天。与使用人工搬运的铝模板相比,起重机吊装的成本不容忽视。然而,由于钢模板本身的强度和基建项目充足的,基础设施项目仍然几乎使用钢模板。