Aircraft Cabin Repair & Refurbishment Considerations and Certification Requirements
Introduction
The Embodiment of Cabin Modifications is typically performed independent of the involvement of the manufacturer. The operator assumes primary responsibility; however, the Buyer Furnished Equipment (BFE) manufacturer is usually a stakeholder in the certification process.
Development of the certification plan is a very important element of the project and establishes the project process as well as methods which will be employed to demonstrate the necessary compliance to enable the certification of the modification.
The certification plan defines and outlines the entire project from a technical and regulatory perspective. Identifying both the new areas of the modification as well as the disturbed aspects areas or systems.
The certification plan is also a key element of the validation process which is required to obtain an approved STC and enable the application for entry to service when the project is complete.
Certification Considerations
领英推荐
Notes on DO-160 Testing
Compliance Matrix
A compliance matrix (CM) becomes a key part of the certification process.
Next Steps
Follow?this link?to our Library to find & Download related documents for Free.
Sofema Aviation Services (SAS) and Sofema Online (SOL) provide Consultancy, Classroom, Webinar, and Online Training including the following course:?EASA CS 25 Compliant Cabin Certification & Mods Training Program – 5 Days
For additional details visit our websites?www.sassofia.com?and?www.sofemaonline.com?or email?[email protected]
Airworthiness Projects Manager, Flyertech/GAMA Aviation.
2 年Great article Steve.