Agri Factor.

This product came after the ASM description ...This is something everyone know and critical for agriculture...This is clear from the zamindar and panna Iyar.etc..small Agri..land owned. May be 2 to 5 acres. This factor really thinks about the Agri land ..which is important for the green farming. This critical issue came into existence by way of green revolution.

The culture test of sand dune to fertile land for farming is due with all test.. The Agri factor product comes with cultural test. .app.. what way it is different from govt. one as well farmer's one...From first session of harvesting to the last session harvesting is the goal point of this product.

All sub related to the culture test will be in this product. Say tractor trilling to normal mono trilling like normal and natural way of trilling by bull or cow. Normally it won't occur for cow...

Rest in next article.

Thanks & Regards

Ramaswamy N

Chairman

Inds-Data Science

LEL: -2960

Cell. No: -+919283124204



要查看或添加评论,请登录

Ramaswamy Narasimhan的更多文章

  • Data Engg-Product.

    Data Engg-Product.

    The DE is going through the re-design in BI concern as well it has to be in actual blue print form. Which i am…

  • UUPI

    UUPI

    This interface have due consideration. After long gap this is updated.

  • Evolution

    Evolution

    This evolution is somewhat date back to later part of '199. when windows nt plays major role in the overall operation…

  • MGM

    MGM

    AI is as automation upgradation..

  • Data Engine-Engg..articulate..

    Data Engine-Engg..articulate..

    AI plays bigger role in Data Engg..

    1 条评论
  • SOD-Nagaraj L lost battle to INDS..

    SOD-Nagaraj L lost battle to INDS..

    Say,, SOD come for the product like gas..

  • ASM-Handover logic

    ASM-Handover logic

    MSP depends on EOD. .

    2 条评论
  • CRED..

    CRED..

    UUPI is important for every transaction of any UPI based interface. This is important for the bank for cardless…

  • Data Center-sub.

    Data Center-sub.

    Migration of any DC from the level of nowhere. to dc10 authorized act.

  • Data Center-Capability

    Data Center-Capability

    VSNL normally take good of capability as a audit in its operation..