#63 Can you have too much Cx on a project?
Quality, Consequences and the Construction Industrial Complex (part 443).
Nobody asked but we are doing it anyway. We are collecting 100 project management and building commissioning questions and will answer them one at a time.
If you have any questions or comments please send them to Marcus Myers, CxA, BECxP, CEM, LEED AP, Assoc. AIA, LFA or Adam Muggleton
BlueRithm Investor & Advisor
Edifice Complex Podcast
#edificecomplexpodcast #bluerithm #ACG #RICS #PMI #PMP #smartbuildings #ProjectManagement #enginering #builtenvironment #buildingperformance #buildingdesign #india #buildingenvelope #buildingconstruction #architecture #ASHRAE #ASTM #ASU? #airquality #analytic #BAS #BCA #BECx #GHG? #healthybuildings? #IAQ? #IEQ #IPMVP? #ISO #LEED #maintenance #smartbuildings? #smartcities
Presumably the extent of Cx could/should vary in relation to the criticality of a system or sub system, focusing time and effort on the higher risk/critical and allowing more pragmatism in lower risk/less critical?...
Director Blue Sky Commissioning
5 个月Some jobs have none or next to nothing and others are flooded with it. We need to get to a point where all jobs are managed efficiently.
House Whisperer
5 个月Where should the buck stop on a project? Who is usually best positioned to be the project manager?
???????? ???????? ???? ???????????? ???????? ???????? ????????.
5 个月No. [I didn't watch the video, but the answer is still no.]