60 day test data just in!

60 day test data just in!

Check this out, the average number of days for the soil to dry out after irrigation using 1.8 gallons of water in an 18 inch circle and average day high temperature of  97.5 degrees F. 

Soil without HydraMat? was dry in an average of  3.2 days

While soil with HydraMat? was dry in an average of  7.1 days!

HydraMat? by EcōsPure more than doubled the time it takes for the soil to dry out. Reducing irrigation water use by over 50% at 97.5 degrees. Soil moisture measured by soil capacitence at a depth of 2 inches. HydraMat installed at a depth of 1-1.5 inches.

 

 

要查看或添加评论,请登录

Mark Banister的更多文章

社区洞察

其他会员也浏览了