5 units ready in 2 months
5 airgap md units 30m2 membrane surface

5 units ready in 2 months

5 units ready for the Canary Islands

No alt text provided for this image

Again we succeeded in producing another 5 full size units with a 30 m2 membrane surface for our customer. So proud of our team that managed to do this in only two months’ time.

These 5 units will be used for a desalination test in the Canary Islands and are sufficient for 20m3 / day for the production of drinking water. Our advanced AGMD/LGMD units can achieve high thermal efficiency compared to other membrane distillation configurations.

Our common goal is to scale up the installation as quickly as possible to a day’s production of 80m3 / day of drinking water.

More to follow soon. For more information, please contact me at [email protected]

www.rnsolutionsbv.com


Kristen Megens - Van Mierlo

Advocaat/Partner BRUIS Advocaten & Mediators

4 年

Prachtig resultaat. Op naar de volgende!

Marijk van Lieshout

voormalig bedrijfsmaatschappelijk werker, vertrouwenspersoon at Arbo Unie, nu aan het genieten van het rentenieren

4 年

Goed gedaan. Op naar de volgende serie

要查看或添加评论,请登录

Radjesh Nidhansing的更多文章

  • Hydrogen from seawater with MD

    Hydrogen from seawater with MD

    Hydrogen from seawater with membrane distillation (MD) Electrolysis is an option for carbon-free hydrogen production…

    8 条评论
  • Super Fertilizer 2.0 (SF 2.0)

    Super Fertilizer 2.0 (SF 2.0)

    January 25th, we started an endurance test of concentrating fertilizer. The installation is already running 1 month…

    2 条评论
  • FERTILIZER 2.0

    FERTILIZER 2.0

    The first fullsize 15m2 LGMD unit ready for our partner in the fertilizer project. The unit will be installed next week…

  • Our solution to the world’s water scarcity

    Our solution to the world’s water scarcity

    When testing our units with seawater, I personally cannot resist showing how much fun we have with the result. I would…

  • High flux with commercial MD units

    High flux with commercial MD units

    In 2017 we were proud of a flux of 3 l / m2 h with our box (flat sheet) MD units. Thanks to our innovations and…

    8 条评论
  • 5 units ready for the Canary Islands

    5 units ready for the Canary Islands

    So proud that we managed to get 5 full size units with a 30m2 membrane surface ready for our customer. And we are extra…

    4 条评论
  • 3 AGMD units ready for Spain

    3 AGMD units ready for Spain

    3 of a total of 5 AirGap Membrane Distillation units are ready for Canary Islands. It will take about 2 weeks before…

    3 条评论
  • Super Fertilizer 2.0

    Super Fertilizer 2.0

    We recently did a test with dewatering of fertilizer for our customer. The results were so good that we decided to…

    2 条评论
  • Launch of our 30m2 AIRGAP MD unit

    Launch of our 30m2 AIRGAP MD unit

    Last Saturday we had our own special launch of a commercial 30m2 airgap membrane distillation unit. We tested the unit…

    20 条评论
  • Dewatering of fertilizer

    Dewatering of fertilizer

    We have further dewatered a liquid fertilizer for our customer with our membranes (liquid gap MD). There is still too…

社区洞察

其他会员也浏览了