  • level 1. Routine Maintenance

Before the mold is removed from the press, it is to be heated (if the mold is chilled)so that all surface condensation is evaporated.

With the mold still warm, internal mold surfaces should be gently cleaned with shop safety solvent to remove any residual dirt and grime, the ejector system moved fully forward, then sprayed with approved rust preventive before the ejector system is retracted and the mold closed.

Lenses and highly polished surfaces should be protected following specific instructions. All water lines should be drained and blown free of all residual water to avoid buildup of rust due to standing water. It is imperative that no water be trapped inside mold.

Check and assure all bolts, plates, clamps etc. are in place and tight. Bag the last shot as an example of the typical quality of this run. Store these parts with the mold.

Every time the mold is pulled from production or put back into production?


  • level 2. Simple Preventive Maintenance

Open the mold. Using properly approved safety shop solvent, remove the mold preservative with a lint free pad.

It is bad practice to immediately run parts on the assumption that the first shots will scrape away the protective coating and will therefore be used to clean out the mold preservative.

Done when removing a tool from storage


  • level 3.Inspection Maintenance

This maintenance is performed by the lead operator or a tool maker at the end of a production run.

Using the check list and visual inspection techniques, the mold is looked over and any minor repairs that are necessary are noted for the convenience of the General Maintenance procedure.

If not, needed repairs or future required touch up notations are kept with the mold history log for future evaluation.

Any components missing or cavity blocked off should be noted and attended to.

A sample from the blocked cavity should be retained for the mold maker to make repairs.

The mold should be washed with safety solvent to remove the varnish and build up-from the molding process.

The vents should be checked for depth in a minimum of four clock-face places around the cavity face.

Notations for work to be done during the General Maintenance procedure should be noted on the form for future work Bent, worn or broken ejector pins should be noted.

The mold should be removed from production and the pins replaced.

20,000 cycles or nine production shifts


  • ?4.General Maintenance

Only competently trained tool room technicians should perform this maintenance All plates are separated and their faces cleaned.

Caution: Highly polished surfaces should not be cleaned with brushes or rags.

Use only uncontaminated facial tissues or cotton balls. Loosen dirt by spraying cleaning fluid into cavity and wipe clean with clean cotton balls.

Do not touch with fingers, dust on fingertips may scratch a polished surface.

Be careful when blowing a cavity out, there may be dust or rust in the air lines which may damage the polished cavity. All components are checked for wear. Any excessive wear is noted and a determination is made to repair, replace or continue to use

All rough areas outside the cavity detail area are to be worked out. Any area inside the cavity detail area with dings, dents or other signs of wear or abuse should be considered critical and should be carefully analyzed before replacements or repairs are commenced

All moving parts are to be lubricated if required. Use lubricant sparingly on all moving parts which make contact with plastic parts .

Vents should be checked for depth, width and land as compared to the tool drawing specifications.

This data should be recorded on the check list and a determination made to repair if required.

They should also be checked for corrosion and vent burns(Better venting may be required)

“O” rings, seals and gaskets should be checked for integrity.

All water lines are to be pressure tested for leaks and recertified for flow capacity.

Water lines that have built up scale and are restricted should be pressure cleanedwith a descaling agent.

The ejector system is to be examined for proper alignment. If the ejector pin holes have become egg shaped it must be determined if they should be re-drilled and bored to a larger size and the existing pins replaced with over size pins. Broken return springs, replating or retexturing as a result of the material eroding the mold surface, replacement of gates or gate inserts, new runner blocks etc. must be analyzed and determined.

Replace all springs after 50,000 cycles

100,000 cycles or every 10 production runs


  • level 5.Major Maintenance

This maintenance should be performed by skilled tool and die personnel.

It should be done when triggered either by the mold fulfilling ?required number of cycles for maintenance, excessive wear or damage to the tool.

Record keeping here is quite important.

Before maintenance begins, there should be four complete shots (Parts,sprues and runners) delivered with the tooling for study.

Two shots should be from the initial mold qualification.

This gives a visual record of what was acceptable when the mold was new and fully functioning.

The second two shots should be the most recent parts produced before the tool was pulled for maintenance.

Comparison of the before and after shots will give an excellent indication of wear and abuse the tool has suffered.

All components determined and authorized to be replaced should be removed and new components constructed and installed in accordance to the original designs if previously certified spare components are not available.

Worn leader pins, bushings and all bearing moving surfaces should be checked for wear and replaced/repaired as required.

Plates and mold cavity surfaces should be checked for parallels and ground flat if required.Mold cavity surface should be cleaned and polished as required to the original surface requirements.

Galling, dings and dents should be worked out until the surface is fully in compliance to the original print specifications.

All components not meeting the part print’s original specifications should be repaired, replaced and re-qualified as required.

All components that have been plated should be stripped and replated wherere quired.

All components that have had special surface treatments for corrosion resistance, lubricity, hardness and the like should be retreated to insure the original intent of the tool.

All moving components should be checked for ease of movement. Adjustments should be made as required.

All return springs in the ejector plate should be replaced with new springs to avoid fatigue.

All water lines should be flushed with descaling agent to remove scale build up.

All”O” rings, internal plugs, seals and gaskets should be replaced.

For tools requiring high production, the cavities should be removed and stress relieved to remove work hardening and material embrittlement.

The entire mold/cavity set must be reinspected and re-qualified as though it was a new cavity.

The mold base is to be inspected for cracks, work hardening, corrosion, etc. If the mold base was plated or painted for corrosion resistance, the coating is to be stripped, the base cleaned and the coating reapplied.

The mold’s ID is to be redone indicating the tool was rebuilt.

The cavity surface is to be inspected for wear or erosion of plating or texturing.

When determined necessary, the cavity surfaces are to be stripped and replated, or the texture is to be polished off and then new texture applied.

250,000 cycles or half the anticipated life time volume


Babar Hashmi

Mold Maintenance Executive at Plastech Autosafe Pvt Ltd

1 个月

you gave good information

回复
Fabian Ortiz

Jefe Taller de Moldes de Inyección y soplado

1 个月

Excelent.

回复

要查看或添加评论,请登录

Bessy -TWT的更多文章

  • The depth of the venting groove should be different depending on the type of plastic material

    The depth of the venting groove should be different depending on the type of plastic material

    Venting Groove Depth The depth of the venting groove should be different depending on the type of plastic. If the depth…

    1 条评论
  • Injection Mold Design: Why Simulation is Essential?

    Injection Mold Design: Why Simulation is Essential?

    Your injection mold design is the first step in creating a functional product. If it is done wrong, your final product…

  • Wall Thickness of Plastic Parts

    Wall Thickness of Plastic Parts

    Prior to ejection from the mold, injection molded parts are cooled down from manufacturing temperatures so that they…

  • Common Molding Defects

    Common Molding Defects

    Injection molding is a complex technology with possible production problems. They can either be caused by defects in…

  • Secrets of Successful Thin-Wall Molding!

    Secrets of Successful Thin-Wall Molding!

    Machinery considerations Standard molding machinery can be used for many thin-wall applications. Capabilities built…

  • Common problems of TPE injection molding parts

    Common problems of TPE injection molding parts

    TPE injection molded parts have surface problems. One of the reasons is poor quality of raw materials, which is also…

  • Hourly labor costs

    Hourly labor costs

    This article provides recent statistics on hourly labor costs in the European Union (EU). In 2020, average hourly labor…

  • Basic Ways to Increase Plastic Injection Mold Service Life

    Basic Ways to Increase Plastic Injection Mold Service Life

    Plastic raw materials, different plastic material types required different temperature and pressure during molding…

  • Injection Molding Crack Solutions

    Injection Molding Crack Solutions

    injection molding, we often see product surface bleaching or broken phenomenon, this phenomenon is what we call the…

    1 条评论
  • How to Choose a Good Chinese Injection Mold Company?

    How to Choose a Good Chinese Injection Mold Company?

    There are many injection mold supplies in China, which is more suitable for you? The following points are for reference…

社区洞察

其他会员也浏览了