30-60-90 % progress on model layout in EPC companies in an integrated manner
Ashwini Oke
Founder of ASETS - Revolutionizing engineering delivery with innovative Integrated Design Suite
Overview of the 30-60-90 Percent Model Development
30 % model
Objective: To establish the conceptual design and basic framework of the project.
Scope: Basic geometry and layout of the project. Preliminary placement of major equipment and structures. Initial identification of major routes for piping, ducting, and electrical conduits.
Review and Validation: Ensures the project's overall feasibility. Major design decisions are made. Identification of potential issues or conflicts.
60 % Model:
Objective: To develop a more detailed and refined version of the project design.
Scope: Detailed placement and sizing of all major equipment. Detailed routing for piping, ducting, and electrical systems. Structural components and supports are more accurately modelled. Inclusion of secondary components and systems.
Review and Validation: Focus on resolving conflicts and clashes. Verification of compliance with design standards and codes. Ensuring that the design aligns with project specifications and requirements.
领英推荐
90 Percent Model:
Objective: To finalize the design, incorporating all remaining details and refinements.
Scope: Final placement of all components. Detailed annotations and specifications for construction. Inclusion of all necessary clearances and access points. Finalized routing for all systems, including insulation and supports.
Review and Validation: Comprehensive review to ensure no conflicts or errors. Final validation against project requirements and regulatory standards. Preparation for construction documentation and procurement.
Benefits of the 30-60-90 Percent Approach
Implementation of the 30-60-90 Percent Model
To effectively implement this progressive model development approach, EPC companies can adopt the following practices:
Conclusion
The 30-60-90 percent model development approach provides a structured and efficient way to develop 3D models in EPC projects. By ensuring systematic progression, early issue detection, and improved coordination, this methodology helps in delivering high-quality, accurate, and detailed project designs. Implementing best practices and leveraging advanced tools can further enhance the effectiveness of this approach, leading to successful project outcomes.
How many of you actually agree 30-60-90 is an effective approach of executing large scaling engineering projects in accelerating project lifecycle?
How many of you would actually like to have it all on a single integrated platform ?
Director Global Capital Project Management at Archer Daniels Midland Company
4 个月Great article Ashwini. Well said in a abbreviated method that shows the importance of 3D modelling and the proper evolution of a project.