3 Simple Criteria for Value Engineering!

3 Simple Criteria for Value Engineering!

We often heard "We need to value engineer a project because of budget constraints", but what does it really mean? To some, it may be changing from one chiller make to another, while others may opt to reroute the ducting and piping to shorter routes. Indeed, you will be able to reduce cost, in reality, do they fall into value engineering?

Let us first define what is value engineering. The key phrase by Investopedia is "less expensive alternatives, without sacrificing functionality". So does replace an efficient chiller with lower efficiency alternative sacrificing functionality? Both chillers serve the same function, what do you reckon?

No alt text provided for this image

This is where I wish to expand the definition offered to include and emphasise 'VALUE' in value engineering. Merely replacing a chiller to reduce cost is purely a cost reduction exercise, it's not value engineering. If so, we were merely shifting CAPEX cost to OPEX with no real benefit to the life cycle cost of the project.

In its true sense of value engineering, I have only three simple criteria; (1) Better (2) Faster (3) Cheaper, if it is not cheaper, why bother? These criteria ultimately serve one objective; it is to help clients to save money.

In a previous project, we value-engineered a central chilled water system and replaced it with a central indirect evaporative system. The proposed alternative design was accepted by the D&C builder purely because it was more cost-effective than the original design and faster to build. The architect loves it for he did not need to allocate space for a sub-station to run the chilled water plant.

The electrical engineer was able to power the indirect evaporative system with existing electrical infrastructure. The structure engineer did not need to strengthen the roof slab, columns and underpinning the foundation to take the weight of the chiller plant. The client was ecstatic with just over 70% reduction in OPEX!

We were equally happy for being able to deliver at first thought an insurmountable problem project. This, in my opinion, was what value engineering is all about. The bonus came when the project was commended for Innovation and Research & Development by Engineers Australia (South Australia).

No alt text provided for this image

Read more about the project at https://www.practicalhvac.com/hvac/indirect-evaporative-cooling-the-university-of-adelaide-hub-central/






Tim Paine

Idling through the craziness!

4 年

Value engineering and cost reduction are 2 very different things. Unfortunately many projects suffer from the latter only to discover escalated project costs even before the project is finished.

Imhh!This is a nice question.I usually do versus by versus for each system to analyze what will sustem will realistically be fit for the zone.Every criteria related with indoor and outdoor environments,geographical consedirations,gravitational,etc. always included jn my study to have the best budgetary assesment for my clients with system’s back pay timeline for a new system design and implementation.This study makes some differences for an existing system depend on its age and/or maintenance history.Moreover I choose to dive deep and do some CFD or FEA analysis to have some corrective actions or improvements needed on the system to make sure its really applicable.For implementation side always choose practical ways to lessen the project timeline to move within the project budget’s barriers.In short I do real time management and analyze every detail needed.

Ultra Gerald Asbroek

Ultra [email protected] - Residential ultra-high efficiency Cool Heat + hot water production . Ultra-starts where others loose site of Efficiency .

4 年

I tend to look seriously at the convenience verses running and long term maintenance cost aligned with emissions With thermal storage of heat and cool the risk drops , then sit and look at every heating and cooling duty on site add all these values and look at the capacity in thermal storage , I broaden the set points within the thermal storage to build capacity then remove traditional one duty machines , typically we achieve large opex costs reductions however look at the installation operational cost savings over 30 years With fill circular heating and cooling we know only minor upgrades to the central machine doing all the heat and cooling may be needed over time and when production capacity changes Thermal storage gives us the capacity much like solar batteries

Muhammad Javed Bhatti - MSc Building Services Eng. , GSAS-CGP-OP

Building Services Engineer | GSAS | MMUP UPDA Registered | Community Association Management | NADCA Certified

4 年

Sorry to say but I think in this article nothing is mentioned about the merits and demerits of the Indirect evaporative cooling and the process you opt to reach to your decision will be worth mentioning. Which would lead us to understand the valu Engineering. Though this article may fall in the category of "Indirect marketing" of Indirect Evaporative Cooling System. ????

要查看或添加评论,请登录

Huey Liew的更多文章

  • What you do not know, will not kill you ... BS!

    What you do not know, will not kill you ... BS!

    I liked it when Tom Graspot mentioned "..

    32 条评论
  • A case for R744 natural refrigerant

    A case for R744 natural refrigerant

    Following the Montreal Protocol's adoption in 1987; industry embraced HFCs and more recently by HFOs to replace CFC and…

    7 条评论
  • Time is your best friend ... truly

    Time is your best friend ... truly

    What would an HVAC engineer know about websites, you may ask! You'll be surprised; read on. For a start, many of us…

  • What do you want from your BMS - 1/3

    What do you want from your BMS - 1/3

    Fresh out of uni back in the days, sitting on some cement bags with a makeshift cable drum as a table. Looking back, I…

    5 条评论
  • Yet another brain farts!

    Yet another brain farts!

    Are we so mentally bankrupt needing to resort to personal attacks? Personal attack? Don't know the actual intent of the…

  • Why is my classroom stale?

    Why is my classroom stale?

    Australia ..

    8 条评论
  • Fanwall

    Fanwall

    Last Thursday, I was sharing this fanwall configuration with a project manager, and he asked: "If this configuration is…

    11 条评论
  • Solar PV - what's the current and future problems?

    Solar PV - what's the current and future problems?

    Don't get me wrong, I am all for renewable energy but not about to jump onto the solar pv bandwagons, for a reasons not…

    4 条评论
  • What is coanda effect and why it is important to HVAC supply air diffusers selection?

    What is coanda effect and why it is important to HVAC supply air diffusers selection?

    Have you had complains on air diffusers dumping cold air onto the person sitting near a supply air outlet? Why does…