Multiple dimensions of BOM complexity

Bill of Material topic is getting more attention these days. No surprise. BOM is a center of universe in manufacturing (and not only) world. People can disagree about terminology applied to BOM management. Depends on a specific domain people can call it part list, specification, formula. But at the same time, everybody speak about the same BOM. Actually, not always the same BOM. I guess you've heard about variation of Bill of Materials - eBOM, mBOM, xBOM, etc. The amount of abbreviations in BOM is growing and often can cause confusion. So, I decided to put some lights on that in my post today.

The importance of BOM management is growing as well as tension around who owns bill of material. Historically, people in different departments disagree about the way they manage bill of materials. As a result of that, departments are splitting and cloning bill of materials to get control and managing it in different systems. It leads to the need to synchronize and copy BOMs together with changes. The tension around BOM management is growing. Last year, I posted some of my thoughts in the post - Will PLM manage enterprise BOM? The main point in this article was around complexity of BOM management and integration between different systems and disciplines.

It looks like BOM will become the next place some of PLM vendors are going to innovate... and battle. My attention was caught by provocative ENGINEERING.COM article - The Power of Zero – Dassault’s ENOVIA chief talks about the ”Zero Error BOM”. Read the article and draw your opinion. I captured the following passage:

The “war” has generally been about linking product development with shop floor IT and the BOM certainly plays a key role in this. Right now there are four primary participants on the battlefield: Siemens, SAP, GE/PTC and IBM.

Article is emphasizing the complexity of "universal BOM" solution and potential advantages of winning BOM battle:

It’s not a simple job to manage a BOM. What might appear as ”a list of parts needed to build a product” is today a complex reality of multiple levels, diversified disciplines and BOMs contains information about structures, electronics, integrated software, manufacturing methodology and the way products are maintained and even disposed of. There are many sources of error and mistakes can be very costly.

If Dassault's “zero error BOM” can become a reality, it’s a huge step forward and would, according to analyst Marc Halpern of Gartner, ”have the potential to realize the ’dream’ of the universal BOM”. But as Kalambi says: ”This is about to embark on a journey; once on ’the road’ the benefits of 3DEXPERIENCE and V6 will increase productivity dramatically”.

I found myself thinking quite a bit about complexity of BOM today and, as a result, came to the following diagram showing 3 main dimensions of BOM complexity: Disciplines, Lifecycle, Changes.

1- Multiple disciplines. The complexity of product is growing these days. Even for very simple products it goes beyond just mechanical and electromechanical design. It includes electronic, software and goes to services and deliveries. Engineers are using multiple tools to create design of products in each discipline. To combine everything together is a very challenging task.

2- Lifecycle. Design represents only one phase of product development. It must be manufactured, shipped, supported and (after all) re-furbished or destroyed. All these processes are going in parallel and requires sophisticated interplay in data and activities. How to connect requirements with design, plan and optimize manufacturing and run support services? This is only a short list of tasks that requires BOM orchestration.

3- Changes (ECO/ECN...). Nothing is static in this world. People are making mistakes. Communication failures happen. Suppliers are going out of business. All these events generate changes that must be applied into different stages of product development - design, manufacturing, services.

What is my conclusion? Bill of Material management reflects one of the most complex disciplines in product development and manufacturing these days. The time when companies managed BOM on the shop floor corkboards are gone. Future BOM management systems will have to be much more sophisticated, integrated and to support multiple dimensions of BOM complexity. Just my thoughts...

Best, Oleg

The original article was published here. More articles on Beyond PLM.

[update 16-Oct-2014]. The BOM complexity diagram was updated following comments about ECR-ECO-ECN

Michael Denis

Senior Director | Intelligent Service Management & Transformation

10 å¹´

Oleg Shilovitsky, I like your discussion and graph. On the SLM side of the house for operations / maintainers, the more common term for what manufacturers / PLM term xBOM is Configuration Management (CM). And just like you place the BOM in the center of the universe - we too place CM and its multiple dimensions at the center of our operate, service, maintain, repair and overhaul SLM universe. Mind if I play around with your graph a bit - add in or extend for SLM capabilities?

赞
回复

I agree, It is fact and reason is attributed is missing analytic capabilities within PLM Architecture. As it do not have functionality to address various Libraries for Management various dimensions and Grading of BOM. Some has cad library, some has part grouping other has analytics but packaged as separate. If PLM Vendors can think big, they can grow within one application the whole ecosystem. Regards, Paritosh

赞
回复

要查看或添加评论,请登录

Oleg Shilovitsky的更多文章

  • In-Person CIMdata’s 2022 PLM Market & Industry Forum Is Cleared For Takeoff

    In-Person CIMdata’s 2022 PLM Market & Industry Forum Is Cleared For Takeoff

    Dear friends, I'm super excited. Later this week, I will be attending the first in-person PLM event for a little bit…

    3 条评论
  • RIP PLM IT?

    RIP PLM IT?

    The original article was published on my Beyond PLM blog No man is an island. And the IT department shouldn’t be one…

    8 条评论
  • How PLM Will Expand Into Electronics and Semiconductor Design

    How PLM Will Expand Into Electronics and Semiconductor Design

    The original article was published on my Beyond PLM blog Today's manufacturing environment is changing more quickly…

    1 条评论
  • Open Semantic Data Modeling Layer For Connected PLM

    Open Semantic Data Modeling Layer For Connected PLM

    The original article was published on my Beyond PLM blog Connected PLM transformation is one of the strong trends I can…

    9 条评论
  • Connected PLM Transformation

    Connected PLM Transformation

    The original article was published on my Beyond PLM blog The weekend is a good time to catch up on multiple…

    2 条评论
  • Getting Ready for PI DX Spotlight - Is a Truly End-to-End Digital Enterprise Achievable?

    Getting Ready for PI DX Spotlight - Is a Truly End-to-End Digital Enterprise Achievable?

    The original article was published on my Beyond PLM blog Today's manufacturing companies are facing challenges that go…

  • Data Model Evolution For Future PLM Platforms

    Data Model Evolution For Future PLM Platforms

    The original article was published on my Beyond PLM blog Data is at the heart of every PLM technology and system…

    3 条评论
  • How To Sell PLM To Engineers?

    How To Sell PLM To Engineers?

    The original article was published on my Beyond PLM blog For the last two decades, PLM was developed in the…

    2 条评论
  • PLM Upgrades Trends

    PLM Upgrades Trends

    The original article was published on my Beyond PLM blog I spent some time this weekend catching up on PLM news and…

  • Demystifying Modern PLM - Event, Videos, and Slides

    Demystifying Modern PLM - Event, Videos, and Slides

    The original article was published on my Beyond PLM blog As COVID hit the world, the PLM industry, like many other…

    2 条评论

社区洞察

其他会员也浏览了