Eric Estrada, a Field Engineer, works closely with our crews and looks forward to discussing the benefits of an ESOP Company with them. https://vist.ly/3mj6wvj #WalkParkPlay #ESOP #Employeeowner #construction
McConnell & Associates的动态
最相关的动态
-
Delivering power easily to 8 new homes in Pilgrim Way, Workshop, didn’t merely involve laying cables. No, it entailed teamwork. It involved impeccable timing. And we had to ensure everything from planning to plug-in was spot on. Want to know more about how we connect new builds with less fuss? Take a look at what we did ?? https://lnkd.in/ewZgzei2 #ukhousing #utilityconnection #worksop #projectsuccess
要查看或添加评论,请登录
-
Site Access is the vital process of gaining entry to a construction site, ensuring that all personnel, equipment, and materials can efficiently and safely enter and exit the project area. It's not just about opening gates; it's about laying the groundwork for seamless operations. Prioritizing safety is non-negotiable in the construction industry. Proper Site Access procedures ensure that everyone entering the site is aware of safety protocols, reducing the risk of accidents and injuries. Imagine a construction site where trucks are stuck at the entrance, delaying deliveries, and workers are waiting around due to access issues. Site Access streamlines the flow of resources, keeping the project on schedule and within budget. Site Access serves as the central hub for coordinating various activities. It facilitates communication among contractors, subcontractors, suppliers, and other stakeholders, fostering collaboration and synergy. In conclusion, Site Access is not just a gateway; it's the foundation upon which successful construction projects are built. By prioritizing safety, efficiency, coordination, and compliance, we can ensure that Site Access becomes a catalyst for project excellence. #SiteAccess #SafetyFirst #Sterling
要查看或添加评论,请登录
-
-
At Arrow Construction Services, every successful project starts with a commitment to protecting our most valuable assets: our people. Whether it’s a large-scale construction site or a simple task, we approach every job with the same attention to detail and a safety-first attitude. Remember, every action counts. A quick safety check, a careful review of procedures, or even a simple question can prevent accidents before they happen. Our goal is not just to finish the job, but to finish it safely. For more inquiries visit our website: https://arrowconn.com/ You can also reach us on +234 803 711 1737 Or send an email to [email protected] You can also stay updated on all our activities by following us on our social media pages: Facebook: Arrow Construction Limited Instagram: arrowconstructionimited LinkedIn: Arrow Construction Company Limited #ArrowConstruction #oilandgas #engineering #SafetyFirst #ProtectingOurPeople #ConstructionSafety #AttentionToDetail #AccidentPrevention #CommitmentToSafety #BuildingWithCare #SafetyCulture #SuccessfulProjects
要查看或添加评论,请登录
-
-
HTp provided a Transport Statement last year in support of an outline application (all matters reserved except for access) to North Somerset Council for the provision of nine residential dwellings at Lostwood in Langford. ? Our report included a forecast of the number of multi-modal trips generated by the application proposals using trip rates provided by the national TRICS database.?The scope of our work included an assessment of the accessibility of the site by non-car modes and confirmed the proposed strategy for pedestrian and cycle movements to and from the application site ??♀??? ?? ? Accident investigation informed our design of the proposed new access from the A38 at a location where the speed limit is 40mph, which was subject to an independent Stage 2 Road Safety Audit. ? The scope of our works included negotiations with the highway officer post submission of the Transport Statement to demonstrate that the proposed access to the application site was both safe and appropriate for all users. ? North Somerset Council approved the outline application on 8th November 2024 much to the delight of our project team ?
要查看或添加评论,请登录
-
-
Taking it ?? with this snapshot of some of the crew reviewing project details #onsite?? https://buff.ly/3CmluD1 #throwback #tbt #throwbackthursday #sitemap #projectmanagement #construction #lowvoltage
要查看或添加评论,请登录
-
-
Field monitoring is just as important as whats done ahead of time. #WearItWell #proudofourhistory #SmilesOfConstruction #BuildingDreams #Construction #Constructionlife #fieldmonitoring
要查看或添加评论,请登录
-
-
NAVIGATING FIRE SAFETY ON RAIL PROJECTS | Fire engineering on rail projects can be complex. When done right, approvals are pain free, stations are safe and easy to operate and the people using them are happy. #NDY’s Global Leader Fire Engineering, Frazer MacDonald, is a fire engineer who understands the rail sector and buildings. In his article, ‘Ease the pain of fire safety on rail projects,’ he dives into the nuances of balancing safety, compliance and practicality. Discover his insights on how to stay on track while maximising commercial and retail potential. Read more on our website: https://lnkd.in/gdFveB-K #MakingSpacesWork Tetra Tech High Performance Buildings Group | Cosentini Associates | Glumac | Hoare Lea
要查看或添加评论,请登录
-
-
Taking it ?? with this snapshot of Paul and some of the crew reviewing project details #onsite?? https://buff.ly/3CmluD1 #throwback #tbt #throwbackthursday #sitemap #projectmanagement #construction #lowvoltage
要查看或添加评论,请登录
-
-
Construction delay Due to high winds can be costly. ?? No Man Rider Slow progress up and down the stairs. Extra time needed for all operations XL Industries mechanical access can reduce these issues and keep your team on track. 1.Never winded off (Think of the savings here) 2.No additional crane needed (Reduce £££££) 3.Significant shaft safety improvements ( Demonstrate H&S) 4.Driver-less (Cost savings £££) 5.Small footprint (No exclusion zone needed) Need more information? ?? [email protected] ?? +44 7496 413 716 #Construction #ShaftConstruction #AccessSolution #healthandsafety #tunnelling J3M CONSTRUCTION TRAINING LIMITED Active Tunnelling Ltd HOCHTIEF (UK) Construction Ltd HOCHTIEF-MURPHY Joint Venture (HMJV) Balfour Beatty plc Murphy Tunnels and Tunnelling International British Tunnelling Society British Tunnelling Society Young Members International Powered Access Federation (IPAF) Joseph Gallagher Limited RORCON LIMITED HB Tunnelling Ltd THE PIPE JACKING ASSOCIATION Farrans Construction Severn Trent United United Utilities National Grid Costain Group PLC STRABAG UK Ward and Burke Northern Ireland Water HS2 (High Speed Two) Ltd BEMO Tunnelling
要查看或添加评论,请登录
-
This week whilst travelling to a client site, I passed Grenfell Tower for the first time, whilst on the train. Having read and heard so much about it, seeing it in person had a completely different impact on me. It spurred me on to finish reading the phase 1 report, and motivated me to read the phase 2 report which is due out today. Without doubt, regardless of the changes in law, these reports contain content that we can all learn from, and we absolutely must learn from them. When reading the phase 1 report, one element that resonated with me the most is the importance of emergency planning and response which is applicable to us all in this industry and an area we don’t pay enough attention too in my opinion. The other, is the importance of technical detail and competence whether it be during construction or maintenance.
要查看或添加评论,请登录
-