W.C. Maloney转发了
Precizion Partner’s concrete saw cutting and drilling team was recently called into action when the Port of Stockton and Vortex Marine Construction, Inc. needed an expert to strategically cut and remove part of the concrete dock. With a beautiful port as a setting, Precizion broke up the top and walls of the concrete dock, wall-sawed vertical cuts at a 20-degree angle in the north dolphin down to the waterline, and drilled a number of pick holes in the concrete. After the careful demolition, we mucked the concrete and ensured no debris fell into the port. We were happy to help keep our hometown port safer and more efficient! Find out more about all Precizion's services: https://lnkd.in/gxWMZfgM