?? The Largest P3 Water Project in North America ?? Thompson Pipe Group supplied bar-wrapped and steel pipe for the San Antonio Water System Vista Ridge Pipeline, designed to handle pressures up to 225 psi. This innovative public-private partnership (P3) reduced taxpayer costs while ensuring reliable infrastructure. ?? Read the full case study to see why these materials were the perfect choice for the job! https://loom.ly/QsDgjSk #ThompsonPipeGroup
Thompson Pipe Group的动态
最相关的动态
-
Best Pipe Flotation Solutions for Pipeline Management https://hubs.ly/Q02Ykt_c0 In this article, we’ll delve into how to select the best flotation solutions for effective pipeline management. We’ll focus on using a flotation calculator to make precise calculations and explore considerations for PVC pipe flotation, including material-specific factors and environmental conditions.
要查看或添加评论,请登录
-
-
#Ductile iron pipe has the advantages of #scalability, #high strength and #corrosion resistance. It has high deformation resistance in high-pressure water supply and gas pipeline systems; Advantages include convenient installation and construction, #economical project cost, etc.
要查看或添加评论,请登录
-
-
Unveiling the Power of Knowledge Sharing in the Underground Infrastructure Industry: NASSCO's PACP Version 8.0 Leads the Way #mswmagazine #municipalsewerandwater #NASSCO #education #training #regulation #pipes #pipeinspection https://loom.ly/cpG8ugQ
要查看或添加评论,请登录
-
The Benefits of High-Quality Dredge Pipeline Floats https://hubs.ly/Q02S02KY0 To ensure the pipeline’s effectiveness and longevity, the use of high-quality pipe floats—is vital. In this article, we will explore the benefits of investing in top-notch dredge floats and how they contribute to maintaining pipeline integrity.
要查看或添加评论,请登录
-
-
A 36” line, crossing under a lake delivering water to the local Community was deemed unusable. Bringing to bear 80 plus years of subsurface utility installation experience, Gabe's Construction Co., Inc. was consulted for a solution.??Partnering with Brierley Associates Corporation and Underground Solutions to deliver a concept to completion project that included: -Proofing the 36” host pipe with 20 ft steel mandrels prior to pullback. -3200 ft?of 20” FPVC pulled into the 36” host pipe. -57,000 Gallons of grout with continuous batching -24-7 grout agitation with grid power, reducing carbon footprint. -Successful hydro test. This critical infrastructure will once again deliver the world’s most precious resource to the local community. #trenchless #waterinfrastructure #partnerships #waterutility
Gabe's "Sliplining"
要查看或添加评论,请登录
-
Completion of a £220K programme of repair work on a section of a major water main, which delivers water from Ballinrees Water Treatment Works to approximately 19,000 homes in Portrush, Portstewart and the wider Coleraine area has been completed ahead of schedule. The original pipeline was installed in 1982 and required essential maintenance work. The project involved the restoration of metal support brackets on a section of this watermain, which crosses the A29 Ring Road, Sandelford Bridge. ? The repairs were identified as part of Northern Ireland Water's ongoing Infrastructure Appraisals Project, investing approximately £3.5m in an overall programme of work to assess the condition of critical infrastructure to ensure the long-term sustainability of these assets. The repair work involved treating the corroded brackets and replacement of all support fixings. These measures will significantly enhance the integrity and lifespan of the support system, safeguarding the water supply to the north coast region. ? NI Water’s Senior Project Manager Gary McFadden said: “NI Water is delighted to announce the completion of this significant programme of work, which will safeguard the water supply to the north coast region. “In order to access the underside of the bridge, our contractor GRAHAM Group adopted a specialised underbridge inspection unit. This innovative equipment allowed the operatives to work safely from the bridge deck above, providing full access to the affected area without the need for riverbank access points. “This inspection unit accelerated the delivery of the work and helped minimise disruption to traffic, resulting in the team completing the work ahead of schedule. “Finally, the NI Water Project team would like to thank the public for their patience and cooperation throughout this major repair work, which will greatly benefit the water infrastructure in the area for many years to come.” ? GRAHAM was the main contractor for the 8-week contract, while McAdam provided technical support for the project. https://lnkd.in/d5dT4fiJ
Essential Repairs to Major Water Pipeline for Coleraine Complete - ahead of schedule
https://www.youtube.com/
要查看或添加评论,请登录
-
In mid-December 2017, blended water (70% fresh/30% reuse) was being pumped through a 16-inch HDPE pipeline in preparation for fracturing operations. Water transfer personnel were alerted to a pipe breach when they immediately noticed a decrease in line pressure and a spike in gallons per minute which resulted in the system being immediately shut down. It was discovered that a weld failed on a 16-inch HDPE water line, releasing blended water throughout the pipeline area, over an embankment, and down the hillside. NGE was on-site within hours to assess the spill and approximate the horizontal extent of impacted soils in order to develop a remedial action plan. #NGE #PipelineRemediation #Remediation https://lnkd.in/e_MTAMib
要查看或添加评论,请登录
-
Annular space inside any buried pipe has never been an industry acceptable practice. When selecting an FFRP system be sure and choose one that follows industry standards and is close fit or tight fit to the host pipe!! Otherwise you run the risk of getting rock, sediment, debris or groundwater in and around your lining system that is detrimental to the liner over time!! #BulletLinerSystem
Why is close fit important? The reason is that when your pipe inflates to your exact internal ID, there is no risk of sediment entering as there is no annulus gap Contact us for your next Potable pipeline rehabilitation project. #waterpipes #europesupport #internationalsupport #nuflow #nufloweurope #asoe #asoepipes #wefixpipes #smalldiameterpipes #largediameter #conditionassessment #pipeburstingsewerreplacement #piperelining #piperelingeu #pipebursting #piperehabilitation #trenchless #trenchlessrehab #trenchlesspipereplacement #watermainreplacement #waterpipeline #oilpipeline #gaspipe #sewerage #pottablewater #trenchlesstechnology #risingmains #closefit #technicalsupport #weknowpipes
Close Fit Liner, No Annulus Gap
要查看或添加评论,请登录
-
Supporting Weston Villages Development The Weston Villages near Weston-super-Mare will deliver 5,000–6,000 new homes over the next decade. Key to this is a 4.5km rising main servicing Haywood and Parklands Village, ensuring efficient wastewater management. Viking Johnson’s Role: We supplied AquaGrip flange adaptors to: - Connect PE pipelines to ductile iron pipework. - Enable air valves to regulate pressure and prevent airlocks. - Provide a durable, easy-to-install solution for future expansion. Proud to partner with FRAZER, envolve infrastructure, and Wessex Water on this critical infrastructure project. Read the full case study at: https://lnkd.in/ecqifGa2 Jude Sira #VikingJohnson #JewsonsCivilsFrazer #EnvolveInfrastructure #WessexWater
Rising Main Pipeline - AquaGrip Flange Adaptors
要查看或添加评论,请登录