PWC Water Construction personnel will be conducting hydrant flow testing overnight at the following locations and times: ? 3060 Gillis Hill Road-4:00am to approximately 6:00am ? Swain Street at Skibo Road- 2:00am to approximately 4:00am. ? 2814 Murchison Road- 12:00 to approximately 2:00am Flow testing should not affect customers, however please note that water from the open hydrants may enter the roadway during flow testing and flushing activities in these areas. PWC Personnel will flush following the flow tests to ensure water clarity. Traffic control measures will be in place. Pedestrians and motorists should use extra caution in the area. For customer questions, please call PWC at 910-438-1382. We appreciate your patience as we safely work on this project. https://lnkd.in/evhgntAQ
Fayetteville Public Works Commission的动态
最相关的动态
-
It's unacceptable that Standards committees continue to operate without detailed and active industry consultation, scrutiny and accountability. This is another example of something being fixed that wasn't broken and leading to wide spread industry cost and confusion. What was the problem? Why is the recommended fix better? What is the cost to the community? Does it have industry wide support? What are the long term ramifications? Who or what organisation was the proponent? What evidence is relied upon to establish the need for change? There needs to be urgent reform in the Standards development space with the Australian Building Codes Board ensuring the Impact assessments are diligently prepared and made publicly available for technical debate and scrutiny, as would be appropriate for any other regulatory proposal for change. #timeforchange #abcb #ahsca #secretcommiteebusiness #governance National Fire Industry Association of Australia
INDUSTRY ALERT: AS2419.1:2021 has abandoned the 100 year plus convention for fire hydrant sluice valves installed in ground to be a left handed spindle. This will lead to wide spread industry confusion for generations to come and the delay and non-compliance of a number of large scale projects under construction. Please don't get caught and make the necessary arrangements prior to final commissioning to avoid delays and claims for liquidated damages.
要查看或添加评论,请登录
-
Motion can reduce your Downtime by offering product options that will increase machine hours.
Construction deadlines don't wait for downtime. We keep your heavy equipment running strong. From hydraulic repairs to engine overhauls, we've got you covered: https://lnkd.in/efTzrg8R #Motion #Construction #HeavyEquipment
要查看或添加评论,请登录
-
-
Learn how construction and operation contribute to the freezing of water piping and identify the subrogation potential of damage claims. 1 CLE. Register: https://lnkd.in/g4DUBZas
要查看或添加评论,请登录
-
-
HYDRAULIC BLOCKERS Creating Novelty in Protective and Optimized Infrastructure.? ? The high-quality Hydraulic Blockers developed and produced by Pak German Engineers. These blockers are used mostly for traffic control and in security and flood prevention.? ? ?Here’s why Pak German Engineers’ hydraulic blockers stand out: ? High-Impact Resistance: To carry heavy loads as well as provide extra reliability and longevity in problem zones.? Customizable Specifications: Products that can be adjusted to fit particular project dimensions, and height and width of the construction site as well as the speed of lifting equipment.? Advanced Hydraulic Systems: The objective to provide long-term and uninterrupted operations in the most challenging conditions.? Emergency Features: Designed to operate in conjunction with systems which lower the lifts in a hurry in case of an unfortunate incident, and comes also with some safety procedures.? Eco-Friendly: This is specifically designed incorporating hydraulic system in energy efficient manners that play a very important role in mere sustainability in modern day infrastructure projects.? ? ?Be it for safety measures or traffic control in cities or the security of important structures, hydraulic blockers from Pak German Engineers are second to none in reliability and have unique features.? ? ?Isn’t it great to witness such an implementation of engineering?! #CivilEngineering #InfrastructureSafety #HydraulicBlockers #PakGermanEngineers #InnovativeSolutions #TrafficControl #Sustainability
要查看或添加评论,请登录
-
-
There is never a "one size fits all" approach to pavement management... In other words, what worked for one road, won't always work on another. Check out the post below to see some common factors that are taken into consideration when performing maintenance on a road ?
"What type of maintenance should we use on our roads?" The best type of road maintenance depends on several factors, some of these including: 1?? Road Condition: Is it a minor crack, a pothole, or widespread deterioration? 2?? Traffic Volume: High-traffic roads require more robust solutions than low-traffic areas. 3?? Budget: Preventative maintenance is often more cost-effective in the long run, but upfront costs need consideration. Overall, there is no "one size fits all" approach... At Pavement Management Group, we analyze your unique road data collected through ASTM standards and by Team PMG to develop customized maintenance plans that address your specific needs. We have the experience and expertise to deliver the best solutions for your roads ?? . . . #PavementManagement #PavementMaintenance #PreventiveMaintenance #PublicWorks #CivilEngineer
要查看或添加评论,请登录
-
-
The maintenance of aids to navigation assets is central to maritime safety and, for the most part, relies on a detailed, hands-on approach to many technical challenges. Maintenance visits need to be regular to ferret out issues before they grow critical. For lighthouses and other structures, this means checking for cracks in masonry, corrosion in metal components, and ensuring protective coatings are intact. Prompt repairs and preventive measures are essential to maintaining their structural integrity and mitigating major costs later. Whilst most modern LED lanterns are exceptionally robust they are not infallible. Physical checks and checks of flash character and range/power settings need to be carried out; range lights and sector lights need checking for sector angles as well.?Large rotating lanterns with LED light sources are unique heritage machines that come with a list of maintenance requirements way too long for this post. AtoN power supplies are predominantly Extra-Low Voltage running at 12 or 24 V from DC batteries recharged by PV solar panels set up as several redundant modules. Cleaning panels, checking cables, components, and connections, and testing battery condition is critical to ensuring ongoing reliability. Specific site by site maintenance plans are extensive documents with detailed technical requirements. The above is only the very basics of what maintenance contractors need to do. As a specialist AtoN consultant, Procurable Marine & Infrastructure can assist contractors to meet their obligations. Can anyone name the lighthouse pictured below?
要查看或添加评论,请登录
-
-
Testing railway #buffer stops is crucial for ensuring safety and functionality. It typically involves various assessments such as #impact testing, structural integrity checks, and compliance with safety standards.
要查看或添加评论,请登录
-
"What type of maintenance should we use on our roads?" The best type of road maintenance depends on several factors, some of these including: 1?? Road Condition: Is it a minor crack, a pothole, or widespread deterioration? 2?? Traffic Volume: High-traffic roads require more robust solutions than low-traffic areas. 3?? Budget: Preventative maintenance is often more cost-effective in the long run, but upfront costs need consideration. Overall, there is no "one size fits all" approach... At Pavement Management Group, we analyze your unique road data collected through ASTM standards and by Team PMG to develop customized maintenance plans that address your specific needs. We have the experience and expertise to deliver the best solutions for your roads ?? . . . #PavementManagement #PavementMaintenance #PreventiveMaintenance #PublicWorks #CivilEngineer
要查看或添加评论,请登录
-
-
By carefully excavating around the existing pipe and creating steps into the trench, we ensure safe access for inspections, maintenance, and repairs. Every integrity project we undertake reinforces our commitment to safety, safeguarding the environment and ensuring reliable energy delivery. #PipelineIntegrity #Trenching #EnergyInfrastructure #PipelineSafety #ChallandPipeline
要查看或添加评论,请登录
-