KLG Contracting Inc.的动态

KLG is happy to announce the completion of another successful project in the heart of Downtown Manhattan ?? The historic/landmark restoration of this multi-unit apartment complex features the following: ? Full Abatement of ACM at Main Roof & BH. ? 4500 SF of Roof Membrane Over Vaccum Insulated Panels (VIP). ? Copper Reglet. ? Copper Gravel Stop. ? Concrete Loose Laid Pavers. ? Structual TC Deck Patching. ? Resurfacing Concrete Topping. ? Misc. Concrete Repairs & Coating. ? LL11 Repairs. Although the roof had previous roof recoveries, the existing slab was in severe disrepair as you can expect from a historic/landmark building that was built well over 120 years ago. The project designer chose to utilize VIP insulation to minimize height disturbance at the perimeter flashings while maximizing the R-value which will positively impact the energy saving of the building for years to come.

  • 该图片无替代文字

要查看或添加评论,请登录