Productivity is driven by teamwork, and our work at Studio Park Tower is a perfect example. The crew ditched the "normal" setup and hand-delivered the electric pump and material to the 22nd floor. Because of narrow corridors, we set up the pump in a hallway and tarped off the area to protect walls and smoke detectors. Despite these obstacles, our West Michigan crew adapted, kept the flow steady, and knocked it out of the park. Go RED!
Skilled Laborer at Kent Companies
1 周It was pretty cool to be apart of that one! It took good solid teamwork to get that handled!