Way to do it. Put in a new high turn down Low-NOx burner and modernize to Hawk single HMI touchscreen operation. 1. Water level 2. Steam pressure 3. Draft control 4. VFD/O2 control 5. Host panel lead-lag. 6. Economizer All from one interface #oneflame #poweroftotalintegration #cleaverbrooks #steamboiler
MPN Project Highlight: Cleaver-Brooks Boiler Control System conversion and high turndown in one step. The original boiler configuration had a single point positioning control system with 4:1 turndown ratio on the burner resulting in a high number of starts per hour. The client requested that MPN help to provide a solution to address these concerns. By replacing the linkage system with modern Hawk controls and a high turndown burner, the efficiency was increased and the cycles per hour were minimized. Call MPN today at (914) 332-0088 to discuss how we can help with all of your heating needs. #MPN #cleaverbrooks #boilers #efficiency #morethanboilers