International Grooving & Grinding Assoc Inc的动态

After over 60 years of service, it was determined that the Delaware Memorial Bridge needed a major deck rehabilitation. A Green Building and Design Magazine article explained the work required installing a high-performing deck without adding more weight to the structure. Ultra-High Performance Concrete (UHPC) was installed on this project, which was diamond ground and grooved to ensure a smooth riding surface. The project resulted in a more durable, resilient and smooth bridge deck with “a low financial impact” and reduced CO2. Read more: https://ow.ly/Gano50UVcI4 #concretepreservation

要查看或添加评论,请登录