There are different factors that determine the cost of building, but unfortunately, many people ignore the lifespan. Any building is expected to last for a minimum of 50 years without any major serviceability limit state issues that can render the building unfit for use. The cost of building for 100 years will not be the same as for 20 years. If you remember how we normally build something for temporary purposes and try to cut down on expenses because the structure is temporary, the same applies to buildings. Before you claim that your contractor is doing you a favor by charging you less or collecting too much money from you, ask them about the lifespan of the project. Don't pay for a 20-year lifespan and expect it to last 100 years, and don't compare the cost of your project with a 50-year lifespan to that of a 10-year lifespan. The difference in cost will be evident due to the choice of materials and construction methods. Many of of you will not talk about the money you are spending on a major maintenance on monthly basis. Stop comparing our prices with quacks and unqualified bricklayers. The difference is clear. Please allow genuine construction engineers and professional contractors to breeeeeeeeeeth!!! ????

Reynaldo Gumawid Jr.

Site engr/ civil supervisor at Armpass Technical Services Ltd.

1 个月

On this concreting it is observed that the volume to be casted is big than the produce of concrete by using bagger mixer. The proper pouring of concrete should begin from the very end of the area. In this situation we should divide the area into panel so as to enable concrete non stop in place on a pouring area. Please be minded of doing so this approach will resulted to a lot of cold joint. Divide the area into panel which enable the man power non stop pouring concrete and easy for the workers to do the jod. Divide the panel transversely into a two meter x the width

Md. Mosharof Hossain

Autocad and revit expart as a civil engineer

1 个月

Floor casting

回复
yeqian shi

Architect at Mckimm

1 个月

No bar chairs? bottom cover below steel

Reynaldo Gumawid Jr.

Site engr/ civil supervisor at Armpass Technical Services Ltd.

1 个月

Poor management. No even spacers