?? If there is a will, there is a way! On February 6, 2023, a devastating earthquake caused a 60 meter riveted steel bridge to suffer severe damage, including a 2,5 meter displacement at its support and a fractured floor beam. Despite the challenges, we successfully restored the bridge to its original riveted form with determination and teamwork, achieving the most economical and fastest repair solution. Using a crane for support, we dismantled the damaged components, reproduced them in a factory, and riveted the new parts back into place according to the original design. The bridge was then reinstalled onto its supports and made self-bearing. After completing the final connections, we conducted comprehensive inspections and performed static and dynamic tests. Today, the bridge is once again capable of safely carrying trains. This achievement is the proof of our belief in our goals and the power of teamwork. Mehmet Soner Ba? Volkan Y?lmaz Bridgewiz International Engineering and Consulting Alp Caner, Melike ??nar, Alk?m Ya?ar Kurtulu? PYES, Mehmet Akif Güler #Engineering #Bridge #Rivet #Teamwork #Railways #EarthquakeRecovery #TCDD
Eme?imize ve yüre?imize sa?l?k Ahmet Derya ATE? hocam
Great job! Kudos!
Hay?rl? olsun emek ve yüreklerinize sa?l?k.
PYES A.?. ?irketinde Y?netim Kurulu Ba?kan?
3 个月Ahmet Bey sizin ?abalar?n?z, ?srarla k?prüyü kurtarma mücadeleniz ülkemize b?yle bi k?prüyü kazand?rd?.