Check out our case study that involved our team designing, engineering, and installing a tailored solution involving over 3 miles of conveyor in a 600,000 sq. ft. facility. Our customer was able to consolidate multiple facilities into one while reducing employee downtime and integrating new automation technologies to achieve their desired operational goals! Details: https://lnkd.in/gTf65PRM