Turnell Corp.的封面图片
Turnell Corp.

Turnell Corp.

工业机械制造业

St Charles,Missouri 1,409 位关注者

关于我们

Turnell Corp is a multidisciplinary engineering and consulting company that is focused on developing projects and solutions for the cement and lime industries. Our leading edge tools include: • Cement And Lime Process Engineering • Computational Fluid Dynamics (CFD) using Ansys Fluent • 3-Dimensional modeling – Turnell Corp’s standard since 2006 • Finite Element Analysis (FEA). • Mechanical, Structural, Electrical Engineering and Plant Design • Equipment Supply

网站
https://www.turnellcorp.com
所属行业
工业机械制造业
规模
11-50 人
总部
St Charles,Missouri
类型
私人持股
创立
2006
领域
Process Engineering in the cement and lime industries、Industrial gas processing and handling、Bulk material processing and handling、Environmental emission controls、Fuel processing, firing, and handling、3-Dimensional modeling、Computational Fluid Dynamics、Finite Element Analysis和Structural Engineering

地点

  • 主要

    3829 S Old Highway 94

    US,Missouri,St Charles

    获取路线

Turnell Corp.员工

动态

  • 查看Turnell Corp.的组织主页

    1,409 位关注者

    Optimized Material Flow with DEM Simulations!  Turnell Corp recently designed a Step Chute using Discrete Element Method (DEM) Simulations, delivering exceptional results for our customer. Key Benefits ✅ Optimized Flow – Smooth movement of abrasive materials with minimal wear. ✅ Extended Lifespan – Self-protecting, wear-resistant surfaces for durability. ✅ Seamless Transfer – Efficient material flow between equipment. ✅ Reduced Impact – Less wear on downstream equipment. Need a customized material handling solution? Reach Out!  Sales@TurnellCorp.com #MaterialHandling #DEM #CementPlant

  • 查看Turnell Corp.的组织主页

    1,409 位关注者

    Construction Completion Update Last Month, Turnell Corp completed construction and commissioning for a new Dust Collector and Air Gravity Conveyor. Key features for this project: Mobilization and pre-shutdown work of ~5 weeks Critical Tie–In of ducting and new equipment installation during the 3 week shutdown More than 25,000 lbs of steel erected and installed More than 4,000 ft2 of equipment and ducts insulated More than 7,300 man hours worked encompassing all disciplines 250 ton and 175 ton cranes were used for lifts and reach Erection of chutes and ducts through 4 different floors from top to bottom of Raw Mill Building Thanks to our partner vendors, field workers, and most importantly our client for trusting Turnell Corp on executing this project for them. Have a project in mind? Let us know: Sales@TurnellCorp.com #EPCProjects #CementIndustry #Cementplant

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字

相似主页

查看职位