Tunstall Engineering Group was excited to be a part of this project and help out with the designs of the platforms and flashboards.
No ground? No problem. 💪 Working on the downstream face of the Eucha Dam presented a unique challenge for our team. The slope was far too steep to safely support equipment or crew, and working directly on the dam wasn’t an option due to the risk of structural damage. What about a barge, you ask? Not possible either. The location and water flow made that a no-go. So, we got creative. We engineered and installed a platform system bolted into the concrete of the dam. This gave us the stable working surface we needed without compromising the structure or safety. It’s one thing to design it; it’s another to build it where there’s no ground to stand on. Hard hats off to our crew for always making it happen! #BuildOnUs #DamGoodWork