TI Builders

TI Builders

建筑业

Franklin,Tennessee 667 位关注者

Reinventing Design/Build

关于我们

For over 35 years, TI Builders has been a leader in commercial tenant build-out projects in Sacramento, CA. While completing over 2,300 projects, we have solidified our long-standing reputation by delivering exceptional, on-time results for clients ranging from Fortune 500 companies to some of the biggest stars in the entertainment industry in all different parts of the country, including Northern and Southern California, Nevada, Texas, Tennessee, Kentucky, New York, Massachusetts and Florida. In 2015, TI Builders added a Nashville division when company president Mike Cimorelli relocated his family there. With locations in Nashville, Sacramento, Dallas, Boston, Tampa/Ft Myers and Allentown Pennsylvania, we have the resources to complete all aspects of construction, from concept to design to completion, that many clients so desperately need. These range anywhere from project design and permitting to guarantee of on-time construction. We pride ourselves in making the construction process as painless as possible for our clients, which is affirmed by our large number of repeat customers.

网站
https://www.tibuilders.biz/
所属行业
建筑业
规模
11-50 人
总部
Franklin,Tennessee
类型
自有
创立
1990
领域
Design Build & Tenant Improvements

地点

TI Builders 员工

动态

  • 查看TI Builders 的公司主页,图片

    667 位关注者

    This tenant improvement project in Nashville transformed a former physical therapy office into a beautiful endodontic dental office! Upgrades included over 70 floor corings for plumbing, electrical, and Medgas, adding five exam rooms, a sterilization room, and three restrooms, including private and ADA options. Dr. Poppy Blasieo, a board-certified endodontist in Tennessee, is dedicated to excellent patient care and making dental work enjoyable by using advanced technology.

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
      +2
  • TI Builders 转发了

    查看TI Builders 的公司主页,图片

    667 位关注者

    In this video, Mike Cimorelli, President and Founder, shares insights on changes and best practices as a Design/Build specialist and panelist at the BISNOW event held on September 13, 2024, in Nashville, TN. Cimorelli feels that design-build is the most effective delivery method, and he emphasizes that programming is essential, particularly in the post-COVID era. Engaging a knowledgeable contractor early in the process can help identify and eliminate numerous issues upfront. Additionally, collaborating with an architect who utilizes BIM and Revit modeling to address infrastructure, logistics, MEPs, and challenges is vital. Before submitting construction plans, a thorough pre-plan check must be conducted, and an accurate timeline must be followed to stay organized. One common question from potential clients is, “Are the plans under review yet?” Meticulous plan review by the contractor before the plans are even submitted is essential. If the initial set contains errors, it can lead to additional comments, significantly reducing the chances of addressing them all correctly. In challenging jurisdictions like Austin, TX, or Sacramento, CA, failing to respond to even one comment can delay your project by two months. Therefore, ensuring your plans are precise and adequately responding to comments can significantly shorten your delivery timeline. If you are have any questions about the design/build process or have a project we can help you with, please contact Mike directly at [email protected].

    Timing is everything

    https://www.youtube.com/

  • 查看TI Builders 的公司主页,图片

    667 位关注者

    In this clip featuring our valued repeat customer The Stepping Stones Group, Mike Cimorelli, President and Founder of TI Builders, discusses the topic of “Exiting.” When a fire alarm sounds, it's crucial to identify the nearest exits. Here, we explore the strategic placement of exit signs. The small, dotted lines on the plans indicate the path from the furthest points. During the project design, the Architect considers the total occupancy load to effectively guide people away from the fire hazard. Stay tuned for our next video showcasing a Stepping Stones Group project in Santa Barbara. If you have any questions about the design/build process or have a project we can help you with, please contact Mike directly at [email protected]. ?

    Stepping Stones Plan Exiting

    https://www.youtube.com/

  • 查看TI Builders 的公司主页,图片

    667 位关注者

    In this video, Mike Cimorelli, President and Founder, shares insights on changes and best practices as a Design/Build specialist and panelist at the BISNOW event held on September 13, 2024, in Nashville, TN. Cimorelli feels that design-build is the most effective delivery method, and he emphasizes that programming is essential, particularly in the post-COVID era. Engaging a knowledgeable contractor early in the process can help identify and eliminate numerous issues upfront. Additionally, collaborating with an architect who utilizes BIM and Revit modeling to address infrastructure, logistics, MEPs, and challenges is vital. Before submitting construction plans, a thorough pre-plan check must be conducted, and an accurate timeline must be followed to stay organized. One common question from potential clients is, “Are the plans under review yet?” Meticulous plan review by the contractor before the plans are even submitted is essential. If the initial set contains errors, it can lead to additional comments, significantly reducing the chances of addressing them all correctly. In challenging jurisdictions like Austin, TX, or Sacramento, CA, failing to respond to even one comment can delay your project by two months. Therefore, ensuring your plans are precise and adequately responding to comments can significantly shorten your delivery timeline. If you are have any questions about the design/build process or have a project we can help you with, please contact Mike directly at [email protected].

    Timing is everything

    https://www.youtube.com/

  • 查看TI Builders 的公司主页,图片

    667 位关注者

    Exciting news from TI Builders! Our Tampa Area Manager, Greg Arthur, will be attending the Bisnow Tampa Construction and Development event on November 7th from 8:00 to 11:00 AM ET. This is a fantastic opportunity to connect, gain industry insights, and network with professionals passionate about Tampa's growth and development. If you're attending, be sure to meet Greg to discuss how TI Builders can support your construction and development needs. Don’t forget to use the code JOINME for a discount when registering. See you there!

    查看Gregory Arthur的档案,图片

    Senior Executive Leader | Construction Management | Project Leadership | Revenue Growth | Transformation

    I'm looking forward to attending BISNOW Tampa - Construction and Development. Check it out and join me there for insights and networking - use code JOINME for a discount https://lnkd.in/eevH8997

    • Tampa Construction and Development
  • 查看TI Builders 的公司主页,图片

    667 位关注者

    TI Builders demolished 80,000SF of offices on two stories as well as 35,000SF of structural mezzanine to create a beautiful new warehouse space at?2?Dell?Way in Nashville. We installed a new ESFR warehouse sprinkler system, added LED high bay lighting, warehouse exhaust, and restroom air conditioning in addition to 4000SF of new offices. Our specialty is design/build; call us today to take care of your next industrial project!

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看TI Builders 的公司主页,图片

    667 位关注者

    TI Builders has been working at?5th?and Broadway in Nashille, TN,?for over 2 years on various projects. We have been working both for the developer as well as various tenants. Our work includes such things as shell spaces, storefronts, R&R tile at the retail atriums, and the beautiful tenant improvement for?Le Macaron. We?love being part of such an iconic location in Nashville!

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看TI Builders 的公司主页,图片

    667 位关注者

    In this clip, Mike Cimorelli, President and Founder of TI Builders, discusses the current conditions of our retail project for Restaurant Depot in New Bedford, MA. We encountered a situation with an extensive 43,000 square feet of slab-on-grade, most of which was only four inches thick. Ideally, we prefer a solid six-inch slab, which the original building lacked. The existing floor was uneven with fill, debris, and significant cracking in several areas. Our final approach involved removing the slab-on-grade in sections. The completed project now features a ram board-type material, ensuring everything is covered and ready to turn over to the owner. We have had equipment, workers, and scissors lifts operating on the flooring without any problems. Additionally, we are painting the roof deck to enhance the facility's brightness. If you're dealing with a project that has severe existing conditions, reach out to Mike directly at [email protected]. We have experience in managing and fixing many difficult situations.

    Existing Conditions

    https://www.youtube.com/

  • 查看TI Builders 的公司主页,图片

    667 位关注者

    We are so grateful for the kind words from David Elliot,?Plant Manager at?New Basis in Lebanon, TN.?We successfully executed the build-out for a 125,000 SF first-generation space, including 10,000 SF of office area, extensive manufacturing, the almost 3 foot thick structural foundation for the silos and resin tanks, and (2) precast truck ramps.? NewBasis, a CA-based company, is expanding to TN, creating 249 jobs in Nashville. They manufacture below ground enclosures for various applications. Call us with your industrial needs today!

    • 该图片无替代文字

相似主页

查看职位