T.D. Williamson

T.D. Williamson

石油天然气

Tulsa,OK 66,200 位关注者

For the life of your pipeline.

关于我们

For more than 100 years, TDW has delivered innovative solutions across the pipeline system lifecycle for gathering, transmission and distribution operators. Our people, products and services maximize uptime, improve throughput, avoid shutdown and minimize risk. Team members and channel partners on six continents help pipeline operators safely deliver energy to a growing world while also addressing evolving regulatory and climate challenges. Together, we’re working to keep product in the pipe and emissions out of the air, to prepare pipelines to transport future energy products and to protect the planet by meeting net-zero ambitions.

网站
https://www.tdwilliamson.com
所属行业
石油天然气
规模
1,001-5,000 人
总部
Tulsa,OK
类型
私人持股
创立
1920
领域
Hot Tapping and Plugging、Pigging、Pipeline Solutions、Pipeline Cleaning、Inline Inspection、Advanced Isolation & Repair、Integrated Pigging Solutions、Pipeline Integrity Solutions、Transmission、Gathering、Offshore和Distribution Systems

地点

  • 主要

    6120 South Yale

    Suite 1700

    US,OK,Tulsa,74136

    获取路线
  • 505 3rd Street SW

    Suite 850

    CA,Alberta,Edmonton,T6N 1N4

    获取路线
  • Fabrikkveien 15

    P.O. Box 8011

    NO,Stavanger,N-4068

    获取路线
  • Rue du Travail

    6

    BE,Walloon Region,Nivelles,1400

    获取路线
  • Plot No. 16, Phase III

    Alindra Savli GIDC

    IN,Gujarat,Vadodara,391775

    获取路线
  • 6801 South 65th West Avenue

    US,Oklahoma,Tulsa,74131

    获取路线
  • 10727 E. 55th Place

    US,Oklahoma,Tulsa,74146-6702

    获取路线
  • 6801 S 65th West Ave

    US,Oklahoma,Tulsa,74131

    获取路线
  • 369 Billy Mitchell Rd

    US,Utah,Salt Lake City,84116

    获取路线

T.D. Williamson员工

动态

  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ?? Keep Pipelines Running Safely and Efficiently ?? Our latest blog explores the equipment, regulations, and best practices for hot tapping pipelines. ?? Learn how this proven technique minimizes downtime, prevents product loss, and reduces emissions—all while protecting the integrity of your system. ?? Read the full blog here: https://lnkd.in/gTj-BgDG #PipelineIntegrity #HotTapping #Energy

    Safe, Efficient Pipeline Hot Tapping | T.D. Williamson

    Safe, Efficient Pipeline Hot Tapping | T.D. Williamson

    tdwilliamson.com

  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ?? Understanding CSCC: A Hidden Threat to Pipeline Integrity Circumferential stress corrosion cracking (CSCC) might not grab headlines like axial SCC, but its impact on pipeline integrity can be just as serious. Unlike its axial counterpart, CSCC is more challenging to detect using traditional in-line inspection tools. ?? So, what’s behind CSCC? Factors like geohazards, extreme weather, or installation issues can create the perfect storm for CSCC development—especially when bending strain or changes in load orientation come into play. That’s why awareness and early action are critical. At TDW, we use advanced tools like the MDS? Platform to help operators identify and prioritize potential CSCC threats, enabling proactive remediation before issues escalate. ?? Watch now to learn more about how we’re protecting pipelines, one inspection at a time. #pipelines #oilandgas #energy

  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ???? Successful SmartPlug? Isolation for NCOC Shutdown 2024! ????? We are proud to share that our SmartPlug? technology recently played a key role in a major pipeline isolation project with North Caspian Operating Company (NCOC). In cooperation with our channel partner, Alimay LLP, we successfully completed an isolation for NCOC on a 28" pipeline to enable safe and efficient maintenance. Project Highlights: ?? Location: Offshore ?? Pipeline length: 95.5 km ?? Pipeline Material: CRA Alloy 625 ?? Isolation pressure: 20 bar ?? Scope: Inline isolation, pigging and services ?? Tool Used: SmartPlug? for isolation & Bi-Di Pig for sour fluid separation ?? Tracking: SMARTTRACK? technology Thanks to seamless collaboration between NCOC, Alimay, and TDW, we achieved a 15-day isolation that ensured safe repairs and leak testing of ESV, pig trap and system valves — all within schedule and without any issues. Big thanks to our partners at Alimay and the entire NCOC team for making this project a success. Here's to more safe and efficient pipeline solutions! ???? #pipelines #offshore #oilandgas

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • T.D. Williamson转发了

    查看Jamie Voegeli的档案,图片

    Senior Sales Representative, Hot Tapping & Isolation at T.D. Williamson

    T.D. Williamson Tulsa Service Center continuing to safely & efficiently execute critical projects before the colder months arrive resulting in higher flow rates on this ANSI 600 #naturalgas #pipeline. TDW’s best fit solution for this operator was an 18” Double-Double Stopple #Isolation with bypass on each side. This solution allows pipeline operators the ability to continuously flow natural gas to their customers while the valve replacement and tie-in is completed.

    • 该图片无替代文字
    • 该图片无替代文字
    • 该图片无替代文字
  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ???? Excited for the Global Hydrogen Conference 2024? So are we! ?? On November 20, TDW will join other industry experts as both speakers and exhibitors at this virtual event focused on the future of the hydrogen industry. From live Q&A sessions to insightful presentations, we’re ready to dive into the latest advancements in hydrogen technology. ??? Don’t miss out on this opportunity to connect, learn, and shape the industry’s future! Register for free here: https://lnkd.in/gWgqcARX #hydrogen #energy #sustainability

    • 该图片无替代文字
  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ?? Do You Have Pipeline Corrosion Under Control? ?? Corrosion is a natural process, but it doesn't have to control the future of your pipeline. ??? Regular assessments are key to ensuring its longevity. While a single in-line inspection (ILI) gives you a snapshot of current integrity, understanding how corrosion evolves over time requires more than just one check. ???? In this video, hear from Integrity Engineering Solutions experts Ricky Ramon and Callie Lamb as they discuss how to assess corrosion growth and prepare for the future. ?? #pipelines #oilandgas #energy

  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    Boost your pipeline maintenance efficiency and safety! ?? Dive into the latest TDW blog on pipeline isolation techniques and best practices. Learn how solutions like double block and bleed (DBB), and double block and monitor (DBM) isolations can help you maintain and service your pipelines.??? Read more here: https://lnkd.in/gpNjcjiy #pipelines #energy #oilandgas

    Pipeline Isolation: Essential Techniques and Best Practices | T.D. Williamson

    Pipeline Isolation: Essential Techniques and Best Practices | T.D. Williamson

    tdwilliamson.com

  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ?? Offshore modifications can be a high-stakes challenge, but technical expertise and innovative solutions from TDW are changing the game. In our latest case study video, see how the SmartPlug? isolation tool delivered safe and reliable isolation for over 80 days—keeping an offshore platform’s operations secure during critical modification work. The result? Multimillion-dollar savings by avoiding production losses while safely diverting gas production through a bypass line on the gas export riser. #offshore #oilandgas #pipelines

  • 查看T.D. Williamson的公司主页,图片

    66,200 位关注者

    ?? TDW is excited to kick off Day 1 at the Deepwater Operations Conference! Join us in the exhibition hall as we showcase the SmartPlug? tool—our advanced solution for safe, efficient pipeline isolation in offshore environments. Stop by our booth to connect with our team and learn how TDW innovations are shaping the future of deepwater operations! #DeepwaterOps #offshore #oilandgas

    • 该图片无替代文字

关联主页

相似主页

查看职位

融资