The first stage of the Washougal Towncenter project, the Community Center Modifications, are about to commence!
Robertson Fick Engineering, PC
土建工程
Vancouver,WA 199 位关注者
We evaluate the benefit to the client with every decision we make.
关于我们
Robertson Fick Engineering, PC specializes in providing professional consulting services related to public infrastructure and site development projects. Our mission is to add maximum value to our clients’ projects through unparalleled service.
- 网站
-
https://www.robertsonfick.com
Robertson Fick Engineering, PC的外部链接
- 所属行业
- 土建工程
- 规模
- 2-10 人
- 总部
- Vancouver,WA
- 类型
- 私人持股
- 创立
- 2013
- 领域
- Site Development、Athletic Facilities、Utility Design和Storm Drainage
地点
-
主要
13115 NE 4th Street #240
US,WA,Vancouver,98684
Robertson Fick Engineering, PC员工
动态
-
? Robertson Fick Engineering is proud to have been a part of the recently completed CAM Academy for Battle Ground Public Schools.?This video shows the excitement of students and teachers alike as they experience their new facilities.?We are so happy that the CAM Academy has a place to call home.
What do you like best about the new CAM Academy campus?
https://www.youtube.com/
-
This fantastic fly-through of our project for the City of Washougal was produced by Shapiro Didway!
-
We are excited to partner with the City of Washougal to bring this project to life!
Washougal eager for ‘big splash’ in town center; Construction set to start in 2025 despite $970,000 shortfall
columbian.com
-
Two of our recent projects were named in Vancouver Business Journal’s 2023 Top Projects Awards. In the Public Projects category, the Mill Plain Elementary School Replacement was 2nd, and the Evergreen Public Schools Transportation Center was 5th.?We are so happy to have been a part of the design for these two great community projects.??
-
-
The new Mill Plain Elementary School was constructed as a replacement for the existing school that was originally constructed in the 1950’s.?The project included a new 61,000 s.f. multi-story building, multiple parking lots, separated bus drop-off and pick-up, play areas, utilities, and other amenities.?The existing western athletic field was retained and improved with field drainage.?Robertson Fick Engineering worked with school district staff to design a site layout that addressed the different needs of the various stakeholders.?Professional services included site design, land-use, grading, storm drainage, water, sanitary sewer, and public street improvements.??