Getting out of the usual routine and enjoying each other’s company away from the office makes for a stronger team. Most recently, the RRVA team visited the MSUM Planetarium and it was OUT. OF. THIS. WORLD! ?? Other team building events have included volunteering, ax throwing, a cooking class, and more. Every event includes laughter, camaraderie, food, and a stronger, more resilient team! #FMDiversion #teambuilding
关于我们
Red River Valley Alliance (RRVA) is a consortium of developers charged with developing, designing, construction, operating and maintaining the stormwater diversion channel of the Fargo Moorhead Area Diversion project. The lead members of the public-private partnership agreement include ACCIONA, Shikun & Binui USA and the North American Construction Group. RRVA is responsible for the construction of the stormwater diversion channel and the necessary associated infrastructure including bridges, railway crossings, inlets, outlet and aqueducts, plus operation and maintenance for 30 years upon completion. All project update information can be found at fmdiversion.gov.
- 网站
-
www.rrvafm.com
Red River Valley Alliance的外部链接
- 所属行业
- 建筑业
- 规模
- 11-50 人
- 总部
- Fargo,ND
- 类型
- 合营企业
- 创立
- 2021
地点
-
主要
4816 Amber Valley Pkwy S
Suite 100
US,ND,Fargo,58104
Red River Valley Alliance员工
动态
-
This week is ??♀?Women in Construction Week??♀? and we're proud to showcase the amazing women working on the FM Area Diversion project. Thanks to ASN Constructors safety professional, Brandy Leon and Jacobs engineer, Katey Levihn for sharing their stories with Valley News Live's ND Today viewers. ?? We appreciate Sophia and Tatum having us on the show! Take a look: https://lnkd.in/g6qAjkpH #WomeninConstructionWeek2025 #FMDiversion #construction
-
-
ASN Constructors and their work on the stormwater diversion channel portion of the FM Area Diversion was featured by Trimble Inc.! ASN uses Trimble technology in a variety of ways to make the job site safer, more efficient, and ensures everyone stays connected at all times. Learn more about how ASN uses Trimble technology! #FMDiversion #floodprotection #construction #infrastructure #technology
-
It can be hard to imagine the scale of a project like the stormwater diversion channel. Check out this video to get a better idea of just how massive the channel, and the equipment being used to build it, really is. #FMDiversion #floodprotection #construction #infrastructure
Putting the Stormwater Diversion Channel in Scale
https://www.youtube.com/
-
The stormwater diversion channel and associated infrastructure portion of the FM Area Diversion project features not one but TWO aqueducts to carry the Maple and Sheyenne Rivers over the channel. This is no small feat! Plus, the aqueducts will have a heated low flow channel enabling ?? fish passage ?? even in the coldest winter months. Learn more about work happening at the Maple River Aqueduct structure. #FMDiversion #floodprotection #infrastructure #construction
It's incredibly cold outside, but things are heating up at the Maple River Aqueduct. ASN Constructors and a few subcontractors have been working on different aspects of the project. Woody's Rebar is handling - you guessed it - rebar work, Meyer Contracting is working on the wing walls, and Parsons Electric is getting work started for the heated portions of the structure. Jeremy Fenske with ASN Constructors shows us the work. #aqueduct #construction #electrical #winterconstruction #infrastructure #FMDiversion
-
Winter is a great time to work on the stormwater diversion channel portion of the overall FM Area Diversion project. Learn more about how we keep working through the winter. #FMDiversion #floodprotection #construction #infrastructure
Have you driven by an FM Area Diversion construction site and wondered how work is continuing through the coldest winter months? We show you some of our considerations in this short video. #winter #FMDiversion #winterconstruction #infrastructure
Winter Construction on the Stormwater Diversion Channel
https://www.youtube.com/
-
The people working on the FM Area Diversion project are our biggest asset. Hear from DJ, a foreman on ASN Constructors' channel team to learn more about his role. #FMDiversion #floodprotection #construction #infrastructure
DJ Gunville started as an equipment operator with ASN Constructors a couple of years ago and now works as a foreman. Watch what he does. #FacesoftheDiversion #floodprotection #construction https://lnkd.in/gMGQE2fe
Faces of the Diversion: D.J. Gunville
https://www.youtube.com/
-
?? We are excited to share our work and progress with a variety of audiences. Last week, the stormwater diversion channel was featured in the ND Ready Mix & Concrete Products Association Annual Convention's tech day. Later this week we'll be at the Red River Basin Commission's 42nd Annual RRBC Land and Water International Summit Conference to share our work, progress, and sustainability efforts. #floodprotection #FMDiversion #presentation
-
-
We wish you all a Happy New Year! Our 2024 was a big one. Take a look at all the progress made over the last year including 28million cubic yards of earth excavated for the stormwater diversion channel portion of the FM Area Diversion! ?? Here’s to a prosperous 2025! ??
Happy New Year! We saw incredible progress on the FM Area Diversion project last year. Did you know that 68 individual components were under construction in 2024? Here are some other interesting facts about what was accomplished on the mission toward permanent, reliable flood protection. #infographic #FMDiversion #floodprotection #construction #infrastructure #constructioninfographic ASN Constructors, U.S. Army Corps of Engineers, St. Paul District, City of Moorhead, The City of Fargo
-